Get Mining Sites Online Fast

GridStrong delivers rapid, scalable power infrastructure for crypto operations, minimizing downtime and maximizing uptime.

decor

Industry Challenges

Modeling & Simulation Challenges

The various load sources at an AI crypto miner each present complex variable load models. Combined, they present an entirely new challenge to the power systems modeling industry.

Load Stability Challenges

The variable and dynamic load profiles of AI crypto miners present complex challenges to voltage and frequency stability on the grid the scale of which have never been encountered in transmission planning and AC stability analysis.

Stringent Reliability Requirements

Even minor power disruptions can cause major data loss or service interruption, affecting wide swaths of the economy. The solution to power stability in crypto mining is far from solved.

Interconnection &
as-built Studies

Run interconnection and as-built studies in-line with each RTO's and TO's exact requirements. Manage model development and updates seamlessly throughout the interconnection process all the way through to post-COD stability assessments.

Documented chain of custody of model and plant parameters from the very first model subsmission.

A blue and red graphic of a server and a server server.

Seamlessly run pre- and post-commissioning model simulations across phasor and time domains using a coordinated parameter library that you can verify matches the actual settings at the plant.

Handoff the project to operations post-COD with a comprehensive picture of the plant's lifecycle.

Track model requirements at each stage of the interconnection process based on the RTO's specific requirements.

decor
decor

Who It's For

Power System Modelers

Learn More

NERC & ISO Compliance Officers

Learn More

Asset Managers

Learn More

Plant Engineers

Learn More

BUILT BY A FRUSTRATED CONSULTANT TO END FRUSTRATION FOR OWNERS & OPERATORS

Get a Demo
A black and white photo of an airplane in the sky.