The bulk power system changed. GridStrong is how it's managed.
The new grid runs on power electronics: inverters, converters and controls acting a thousand times faster than the machines they replaced, and a wave of standards written to match. If it connects to the bulk power system, it runs on GridStrong: the system of record for every plant, load and interconnection, with nothing left to chase.
Free for one plant: an initial NERC PRC-028-1 disturbance monitoring study,
delivered in a week or less!



































Who we serve
From the interconnection request to operational compliance: application models, model quality testing, PRC and MOD programs, event analysis and the asset record, every plant handled the same way.
Data centers and other large loads now carry grid requirements of their own: NERC registration, interconnection studies, ride-through evaluation and requirements tracking for the developer, the hyperscaler and the operator.
Automated model quality testing across the interconnection queue, tested against the operator's own rulebook, with pass or fail and the evidence delivered into the operator's systems.
Explore our services
A module is a defined scope of consulting work paired with the automation that runs it: the inputs it needs, the steps it runs, the evidence it keeps and the deliverable it produces. Subscribed per plant, each one faster than the manual version and every result traceable to its source.
Every NERC Operations and Planning, CIP and regional standard that calls for a study or a program, for example PRC-028 disturbance monitoring readiness, PRC-005 maintenance programs, FAC-008 facility ratings, GO/GOP registration and ERCOT NOGRR 255, and much more.
See the modulesRide-through, capability and model verification for every standard that asks for it, for example PRC-029 and PRC-024 evaluations and MOD-025, 026 and 027 verification, plus PSCAD plant models and model quality tests for ERCOT, CAISO, MISO, Southern Company and other interconnection authorities.
See the modulesInterconnection model packages, stability assessments and study responses for any ISO, RTO or utility, for example ERCOT interconnection and quarterly stability assessment (QSA) packages, with version control of every model from the request to post-commissioning.
See the modulesEvery NERC standard with an operational or event requirement, for example PRC-030 unexpected event mitigation, PRC-004 misoperation review and PRC-029 event performance, with PMU, SER and DFR records ingested and events identified.
See the modulesWe handle everything for you
SharePoint, a governance, risk and compliance (GRC) platform, spreadsheet trackers, an internal tool, email RFI tracking and a ticketing system became one record in sixty days, with 400,000 engineering files migrated.
On that record we then read 23,000 compliance documents against 1,900 claims at about 70 plants and tested every claim. About 45 percent were proven. Three weeks later every claim carried a written verdict and the document behind it.
Today the owner's compliance, modeling and interconnection work runs on the Dashboard, and the chasing that went with the old systems is gone.
Your free PRC-028-1 study
Pick a plant. We build its system of record in the Dashboard and run its NERC PRC-028-1 disturbance monitoring assessment, at no cost, so you see the result on your own fleet before you decide anything. The last plant we did this for was a large wind plant. Within 23 hours of first look, its record held about 130 pieces of equipment, about 3,700 data fields filled in and about 4,100 fields with evidence attached, each traced to the page it came from. The assessment was delivered the same day.
A mutual NDA so your files, models and settings are covered from the first upload.
Drawings, relay settings, recorder configurations, OEM manuals, prior studies, in whatever state they are in. Drop them in the Dashboard or share a folder. We sort them.
Your plant's record and the initial PRC-028-1 assessment are in the Dashboard within 72 hours for your final review. The signed assessment, a $20,000 to $40,000 value, follows in under a week.
The old way cannot keep up
Swipe for the full table
| The old way | On GridStrong |
|---|---|
| Manual studies, rebuilt for every plant | The same procedure, run the same way every time |
| Spreadsheet-based QA | Models benchmarked against as-left settings and a first-principles check |
| Multiple vendors, multiple inboxes | One connected record, permissioned by plant and department |
| Weeks-long timelines and a PDF at the end | Initial results in the Dashboard within 72 hours, watched live |
| Prone to human error, hard to audit | Every conclusion traceable to the file behind it, signed by a licensed engineer |
| A new statement of work for every plant or standard | Add a plant or a standard and the record extends to it |
The system of record
The GridStrong Dashboard holds every plant, model, requirement and deliverable, and runs the studies and compliance procedures on top of them. Engineers work in it every day. Auditors read from it. Nobody chases a file, and every spreadsheet goes away.
The same validated procedure and the same benchmark for every plant, whoever runs it.
Initial results in the Dashboard within 72 hours of your files arriving.
Every intermediate result and every file behind every conclusion, as it happens.
Models, settings, evidence and deadlines stay in your record when the engagement ends.
How it works
Plants, models, OEM data and requirements come into the Dashboard once. Files are tagged and tied to the standards they serve.
Studies, model quality tests and compliance procedures run in the platform, by GridStrong engineers or by yours, the same way every time. Nothing waits on whoever is available.
Reports, evidence and settings stay in the system of record, ready for the next filing, the next audit and the next standard.
A working session with a GridStrong engineer on your plants, your standards and your queue positions.