Resource Hub
Free and written by the engineers who run the studies: what each standard requires, when it applies, and what to do first.
Browse by section
One page per standard: what each requirement says, who it applies to, the dates, the evidence an auditor expects, and a free template procedure.
Open the Help CenterEffective dates and compliance deadlines for the NERC standards and ERCOT rules that apply to inverter-based resources.
See the datesSide-by-side tables of how NERC and the ISOs set the same requirement, each with the date we last checked it.
Compare the rulesShort briefs from our engineers on deadlines, enforcement, model quality and interconnection. Free PDFs.
Get the documentsArticles from our engineers on ride-through, disturbance monitoring, modeling and large loads.
Read the articlesConference talks and papers by our engineers, with the people who gave them.
See the talksInsights: compliance and deadlines
Where things stand on NERC Category 2 registration, PRC-029-2 and PRC-030-1, MOD-026-2 and PJM's IEEE 2800-based interconnection requirements, and what generator owners do next.
Read the guidePRC-029-2 and PRC-030-1 took effect October 1, 2026, with Category 2 dates on January 1, 2027; PRC-028-1 monitoring phases in through 2030; and MOD-026-2, effective April 1, 2026, makes EMT models due from 2029. Dates and an action plan.
Read the guideCategory 2 registrations took effect May 15, 2026. What registered owners now owe, and what to do if a facility was missed.
Read the guidePRC-029 sets critical ride-through requirements for inverter-based resources (IBRs).
Read the guidePRC-029-2 makes IBR ride-through performance-based, so design, models and event data need to be managed together.
Read the guidePRC-028-1 & ERCOT NOGRR 255 demand SER, FR & DDR - know what to record and how to pass audits.
Read the guideModeling and interconnection
NERC PRC-029-2 describes frequency as typically measured over 3 to 6 cycles, a figure that matches classical zero-crossing methods. Modern DFT and Kalman filter techniques achieve better accuracy in fewer cycles, raising the question: should standards specify accuracy targets instead of cycle counts?
Read the guideAn overview of ERCOT's Model Quality Testing (MQT) and the PGRR109 dynamic model reviews for IBRs, what each requires, and common problems owners run into.
Read the guideWhat PJM's MOD-026/027 guidance (Revision 4, July 2025) asks Generator Owners to submit, and what changes as MOD-026-2 phases in.
Read the guideData centers
Translate data center reliability risks into utility-ready models: powerflow, EMT, short-circuit & harmonics.
Read the guideAI data centers are not "just loads": fast ramps, ride-through and power quality create new grid reliability risks.
Read the guideInterconnection studies, ride-through evaluation against the operator's suite, and requirements tracking on one record.
See the approachA working session with a GridStrong engineer on your plants, your standards and your queue positions.