Customers
Utilities, renewable fleets, developers and system operators run their compliance, modeling and interconnection work on GridStrong, with the same result every time and nothing left to chase.
Asset owners, developers, utilities, system operators and the U.S. Department of Energy's Office of Electricity

















Case studies
Written from the delivered records: the problem, what GridStrong did, how it differs from the old way, and the result.
About 70 plants, 1,900 claims, 23,000 documents read. About 45 percent of claims proven, every verdict cited to a page and date, delivered in about two days.
Read the case studyA large wind plant in Texas: about 550 checklist items answered with about 1,100 citations from about 930 documents, delivered in 23 hours against a manual estimate of six to eight weeks.
Read the case studyA regional transmission organization posts a model package to our API and gets the full report back in under four hours, dozens of packages a day, no engineer in the loop.
Read the case studyThe standards we work within
GridStrong engineers sit in the NERC, IEEE and regional working groups where the requirements for inverter-based resources and large loads are written. The platform tracks 135,000 grid-code requirements across North America to the page.



A working session with a GridStrong engineer on your plants, your standards and your queue positions.