Markets
ISO and RTO studies for system operators, compliance and modeling for generation owners, grid-code compliance for data centers and large loads, and the substation record for transmission owners, all on the same models, requirements and procedures.
01 · ISO and RTO studies
System operators contract GridStrong to run automated model quality testing across the interconnection queue: PSCAD and PSS®E packages retrieved, tested in isolated environments against the operator's own rulebook, and returned with pass or fail and the evidence, through an API-to-API integration or the Dashboard.
02 · Generation
Owners of wind, solar, storage, hybrid and synchronous plants run the whole lifecycle in one record: interconnection modeling and model quality testing before commercial operation, then NERC and ISO compliance, event analysis and asset management after it.
03 · Data centers and large loads
Data centers and other computational loads now carry NERC and ISO/RTO requirements of their own: registration, interconnection studies, models, ride-through and operating data. GridStrong is the compliance expert that takes the site through all of it and keeps the record for the operator and the developer.
04 · Transmission
If you own substations at 69 kV and above, GridStrong is your system of record. It is the same approach that runs a generation fleet, applied to the work of a Transmission Owner: what is in each substation, how it is rated and protected, which schemes and agreements govern it, and the evidence behind every NERC requirement.
A working session with a GridStrong engineer on your plants, your standards and your queue positions.