Standards Help Center
Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
PRC-005-6 requires Transmission Owners, Generator Owners and Distribution Providers to establish a Protection System Maintenance Program for the Protection Systems, Automatic Reclosing and Sudden Pressure Relaying listed in the standard's Facilities section, and to maintain those Components under that program. Time-based programs follow the minimum activities and maximum intervals in the standard's tables, performance-based programs follow Attachment A, and the entity must demonstrate efforts to correct identified Unresolved Maintenance Issues.
Source
NERC PRC-005-6 (standard page)October 29, 2026
Requirements
What it means. Establish a Protection System Maintenance Program (PSMP) that identifies, for each Protection System, Automatic Reclosing and Sudden Pressure Relaying Component Type, whether maintenance is time-based, performance-based per Attachment A, or a combination. All batteries associated with the station dc supply Component Type must be in a time-based program. Where monitoring is used to extend intervals beyond the unmonitored ones, the PSMP includes the monitored Component attributes the tables require.
Evidence an auditor expects. The documented PSMP showing the maintenance method for each Component Type and the station batteries in a time-based program, and, where monitoring extends intervals, evidence such as manufacturer's specifications or engineering drawings of the monitored attributes.
What it means. An entity that uses performance-based intervals follows the Attachment A procedure to establish and maintain them. Attachment A works on Segments of at least 60 Components, keeps them on time-based intervals until results exist for at least 30 Components, and sets each Segment's maximum interval so that Countable Events occur on no more than 4 percent of its Components. Ongoing use requires maintaining the greater of 5 percent of a Segment's Components or 3 Components each year, and an action plan when Countable Events reach 4 percent or more.
Evidence an auditor expects. Component lists, dated maintenance records, and dated analysis records and results.
What it means. Maintain Components in a time-based program to the minimum maintenance activities and maximum maintenance intervals in Tables 1-1 through 1-5, Table 2, Table 3, Tables 4-1 through 4-3 and Table 5. For example, an unmonitored protective relay has a 6 calendar year maximum interval, which includes verifying its settings are as specified.
Evidence an auditor expects. Dated maintenance records, maintenance summaries, check-off lists, inspection records or work orders.
What it means. An entity that uses performance-based maintenance under R2 implements and follows its PSMP for the Components in that program.
Evidence an auditor expects. Dated maintenance records, maintenance summaries, check-off lists, inspection records or work orders.
What it means. Demonstrate efforts to correct identified Unresolved Maintenance Issues, meaning deficiencies found during maintenance that cause a Component not to meet its intended performance, cannot be corrected during the maintenance interval, and require follow-up corrective action.
Evidence an auditor expects. Work orders, replacement Component orders, invoices, project schedules with completed milestones, return material authorizations or purchase orders.
For dispersed power producing resources identified through BES Inclusion I4, PRC-005-6 covers the Protection Systems and Sudden Pressure Relaying on the Facilities that aggregate the dispersed generation from the point where it exceeds 75 MVA to a common point of connection at 100 kV or above, not the individual generating units.
Related guidance
A question about how this standard applies to a specific plant, model or deadline? Bring it to a GridStrong engineer.