CIGRE Canada 2026 / Calgary / September 2026
A comparative assessment of voltage ride-through test profiles in PRC-029-1
PRC-029-1 sets ride-through requirements as voltage-time tables but does not define the test profile. Using EMT simulation of a 200 MW wind plant, the paper compared three test approaches: isolated faults with full recovery and sequential steps with a 10-second recovery both passed, while sequential steps with no recovery tripped. Same plant and settings, different results, so the paper calls for a clearer profile definition or guidance coordinated with IEEE 2800-2022.
Paper 10545, with co-authors including Poria Astero.

Iman Kaffashan
Senior Manager, Power Systems Studies, GridStrong