Modules
A module pairs a defined consulting scope with the Dashboard procedure that executes it: the inputs it needs, the steps it runs, the evidence it keeps and the deliverable it produces. Subscribe per plant, per module. Add a plant or a standard and the same procedure extends to it.
Five kinds of module
Swipe for the full table
| Kind | What it covers | Typical time | How accuracy is assured |
|---|---|---|---|
| Compliance studies | NERC Operations and Planning (O&P), CIP and regional compliance programs, procedures and evidence | About one week, all in | Every answer cited to its source page. In independent review of an assessment of about 550 requirements, one correction. |
| Modeling studies | Studies that build, verify or simulate plant models | Two to three weeks, all in, including your review | Automated pass or fail against the official test suite, models benchmarked across PSCAD, PSS®E and TSAT, every verdict reviewed and signed by a licensed engineer. |
| Interconnection studies | Queue, study and submission support for new and changing plants | Model packages in two to three weeks; the rest follows the operator's calendar | Packages benchmarked before filing and submitted in the operator's format, with every submission kept on the plant record. |
| Event analysis | Finding, analyzing and reporting what happened on the grid | Days per event, not weeks | Values pulled from the recordings exactly; the engineer rules on the gray areas and signs the report. |
| Forward Deployed | Embedded teams that run the record for you | Ongoing | The same engineers, in your systems, every week. |
Compliance studies
Every answer cited to its source page.
Sequence-of-events, fault and dynamic disturbance recording requirements assessed against the plant's own files, with equipment gaps, data requests and the readiness report produced from the record.
Review the full module descriptionERCOT's disturbance monitoring equipment, data, retention, reporting and testing requirements tracked and evidenced per plant alongside PRC-028-1.
Review the full module descriptionProject management for executing disturbance monitoring recommendations: equipment options, installation coordination and configuration validation to meet NOGRR 255 and PRC-028-1.
Review the full module descriptionFor plants with hardware limits on ride-through: the documented limitation, technical verification and submittal package for Requirement R4, including the eligibility record for long-lead projects.
Review the full module descriptionRegistration of each applicable plant with its Regional Entity and NERC under the Category 2 Generator Owner and Operator rules.
Review the full module descriptionContinuous review of NERC activity for new or modified standards that will apply to Category 2 registration, with the impact mapped to your plants.
Review the full module descriptionEnd-to-end program management across your registered Operations and Planning and CIP scope: procedures, evidence collection, audit preparation and regulatory change monitoring.
Review the full module descriptionA maintained review of every current and proposed dynamic modeling requirement across NERC and the major ISOs and RTOs, mapped to your fleet.
Review the full module descriptionRevised ride-through capability forms, updated models and supporting material to cure deficiencies identified in an ERCOT market notice.
Review the full module descriptionInterpersonal communication capabilities between the Generator Operator and its Balancing Authority and Transmission Operator, documented and evidenced.
Review the full module descriptionThe Event Reporting Operating Plan: reportable events, timely reporting actions and coordination with the appropriate entities.
Review the full module descriptionCold weather preparedness plans, freeze protection measures and the calculations and documentation the standard requires.
Review the full module descriptionCoordination with the Transmission Planner and Planning Coordinator on reliability studies for new or modified interconnections.
Review the full module descriptionTransmission vegetation management on applicable generator tie-line rights-of-way, with inspections and records on the plant.
Review the full module descriptionA Facility Ratings Methodology and the ratings calculations for every BES element up to the point of interconnection.
Review the full module descriptionData and information provided to the Reliability Coordinator per its specification, tracked and evidenced per plant.
Review the full module descriptionData provided to the Balancing Authority and Transmission Operator per their specifications, tracked and evidenced per plant.
Review the full module descriptionVoltage and reactive control procedures and evidence for the Generator Operator.
Review the full module descriptionVoltage schedule compliance, automatic voltage regulator status and notification evidence per plant.
Review the full module descriptionSequence of events, fault and dynamic disturbance recording requirements for applicable BES buses and elements, documented and evidenced.
Review the full module descriptionThe Protection System Maintenance Program: component types, maintenance activities, intervals and the records that prove them.
Review the full module descriptionRemedial Action Scheme compliance support: documentation, review submittals and evidence per applicable plant.
Review the full module descriptionMaintenance and testing of Remedial Action Schemes documented and evidenced on the plant record.
Review the full module descriptionLoad-responsive phase protection settings evaluated against loadability requirements on applicable lines.
Review the full module descriptionEvaluation of relay performance during stable power swings on notification from the Planning Coordinator or after a trip.
Review the full module descriptionGeomagnetic disturbance planned performance requirements for applicable transformers, documented and evidenced.
Review the full module descriptionA compliance procedure for the Texas RE primary frequency response standard, then a plant-by-plant review against it.
Review the full module descriptionThe Public Utility Commission of Texas emergency operations plan filing, assembled from the plant record instead of written from scratch.
Review the full module descriptionCritical-component declarations and attestations captured against the plant record, ready to file.
Review the full module descriptionProject management for PRC-029-2 corrective actions in the field, from implementation plan to exemption documentation.
Review the full module descriptionA drafted self-report, Align submission support and a mitigation plan when a potential noncompliance turns up.
Review the full module descriptionYour plant's cyber system impact categorization documented in one guided workflow, ending in an audit-ready report.
Review the full module descriptionInterconnection studies, modeling data and Model Verification for data-center sites under NERC's proposed CLO-001-1, including the duties of a Generator Owner whose plant connects one.
Review the full module descriptionOperational data specifications, Operating Instructions and Interpersonal Communication for data-center owners and operators under NERC's proposed CLO-002-1.
Review the full module descriptionProtection System settings coordination and event, fault and disturbance recording for data-center sites under NERC's proposed CLO-003-1.
Review the full module descriptionModeling studies
Automated pass or fail against the official test suite, models benchmarked across PSCAD, PSS®E and TSAT, every verdict reviewed and signed by a licensed engineer.
Ride-through capability, current and power priority and active power recovery modeled and verified against as-left settings, with the exemption path built into the same workflow.
Review the full module descriptionEvidence that frequency and voltage protection settings do not trip synchronous generators, Type 1 and Type 2 wind resources or synchronous condensers inside the PRC-024-4 no-trip zones.
Review the full module descriptionCoordination of voltage regulating controls, limit functions, equipment capability and protection settings for each inverter-based plant.
Review the full module descriptionLoad-responsive relays set to avoid unnecessary tripping during disturbances that pose no risk to the equipment.
Review the full module descriptionProtection systems coordinated so they operate in the intended sequence during faults on BES elements.
Review the full module descriptionGross and net real and reactive capability verified at the point of measurement and packaged for the planning models.
Review the full module descriptionSteady-state, dynamics and short-circuit model data developed and submitted to the Planning Coordinator's specification.
Review the full module descriptionEngineering and modeling actions required by NERC's Level 3 essential-actions alert on inverter-based resource performance.
Review the full module descriptionERCOT's revised voltage and frequency ride-through requirements evaluated for new and existing inverter-based resources and wind plants.
Review the full module descriptionModel updates when NOGRR 245 compliance changes inverter, turbine or relay settings, with verification and OEM coordination.
Review the full module descriptionPSCAD, PSS/E and TSAT models updated when inverter, turbine or balance-of-plant settings change, verified against the installed settings.
Review the full module descriptionTransient overvoltage restudy where extended ride-through capability requires it, scoped from the ride-through workflow.
Review the full module descriptionERCOT Dynamic Working Group model quality tests run on the plant's models before field implementation, with benchmarking and tuning.
Review the full module descriptionPSCAD simulations mirroring CAISO's electromagnetic transient model quality validation checks, with the evidence and reports generated from the record.
Review the full module descriptionModel quality tests per MISO's Business Practices Manual for resource interconnection, with pass or fail returned through the operator's process.
Review the full module descriptionAdditional model quality and grid-forming conformity tests for grid-forming inverter-based resources.
Review the full module descriptionModel quality assessment support for inverter-based resource model development and compliance in Southern Company's territory.
Review the full module descriptionA PSCAD plant model built from OEM unit and controller models and the site's electrical parameters, benchmarked against the PSS/E model.
Review the full module descriptionDominion FIR Attachment 7 tests and PJM model checks, run on your PSCAD and PSS/E models and written up for submission.
Review the full module descriptionThe ERCOT automatic voltage regulator step-response test, from site procedure to the submission package your Qualified Scheduling Entity files with ERCOT.
Review the full module descriptionMeasured governor response laid over the simulated model response, with a cited verdict for the verification package.
Review the full module descriptionA rule-by-rule power factor envelope verdict from the submitted capability curve, in place of a hand check.
Review the full module descriptionA subsynchronous resonance vulnerability verdict and mitigation tier from the point of interconnection impedance scan.
Review the full module descriptionThe simulated ride-through response checked against the ERCOT no-trip envelope, with a cited verdict.
Review the full module descriptionThe ISO-NE Planning Procedure 5-6 Appendix C-2 test battery at short circuit ratios 3 and 10, run on your PSCAD and PSS/E models.
Review the full module descriptionDynamic models and the documentation of model verification and validation, prepared against the Transmission Planner's dynamic model requirements and provided to the Transmission Planner.
Review the full module descriptionThe PJM electromagnetic transient model-quality battery, run once and reusable across PJM transmission owner zones.
Review the full module descriptionA PSS/E plant model built from the OEM unit and plant controller models and your site's electrical data.
Review the full module descriptionThe SPP model quality tests for inverter-based plants, benchmarked across PSCAD, PSS/E and TSAT.
Review the full module descriptionA PSS/E model built in the dashboard from steady-state and control data, with no model package to start from.
Review the full module descriptionInterconnection studies
Packages benchmarked before filing and submitted in the operator's format, with every submission kept on the plant record.
Modeling and support through every phase of an ERCOT interconnection request, from application to energization.
Review the full module descriptionThe PSCAD dynamic model package, model quality tests, reactive power study and planning data required before the quarterly stability assessment.
Review the full module descriptionCentralized tracking, version control and update support for every interconnection model submitted to the operator, from request through post-commissioning.
Review the full module descriptionModel packages and study support through SPP's Consolidated Planning Process under Attachment AY, from the Interconnection Cluster Study Queue Cluster Window and short-circuit-ratio and critical-clearing-time screening to commercial operation.
Review the full module descriptionModel packages, model quality tests and study support through MISO's Definitive Planning Phase, the Generator Interconnection Agreement and commercial operation, built to the model requirements in MISO's generator interconnection Business Practices Manual.
Review the full module descriptionPSS/E and PSCAD model packages and study support through PJM's Cycle process under Manual 14H, from the Application Phase and Decision Points I to III to the Generation Interconnection Agreement and commercial operation.
Review the full module descriptionGE PSLF and PSCAD models, model quality tests and study support through CAISO's cluster process under the Resource Interconnection Standards, through commercial operation.
Review the full module descriptionModels and study support through NYISO's Cluster Study Process under Attachment HH of its Open Access Transmission Tariff, from the Application Window to commercial operation.
Review the full module descriptionPSS/E, PSCAD and short-circuit models, Planning Procedure 5-6 model acceptance tests and study support through ISO-NE's Cluster Study Process, through commercial operation.
Review the full module descriptionPSS/E and PSCAD model packages, model performance attestation and study support through the Southern Companies' Annual Cluster Study, from the Cluster Request Window to Commercial Operation.
Review the full module descriptionModel packages and study support through Salt River Project's annual cluster process under Attachment O of its Open Access Transmission Tariff, from the Cluster Request Window and Decision Points I and II to commercial operation.
Review the full module descriptionPSS/E and PSCAD model packages, Capability and Performance Requirements Review and commissioning support, and study support through the Duke Energy Carolinas and Progress cluster process, from the Cluster Request Window to Permission to Operate.
Review the full module descriptionPSS/E and PSCAD model packages and study support through the Tennessee Valley Authority's Cluster Study Process, built to its Modeling Requirements Revision 5, from the Cluster Request Window to post-commercial-operation model evaluations.
Review the full module descriptionPSS/E and PSCAD model packages and study support through Florida Power & Light's annual cluster process under Attachment M of its Open Access Transmission Tariff, from the Cluster Request Window to the as-built model package after commercial operation.
Review the full module descriptionPSLF, ASPEN OneLiner and PSCAD models, commissioning test support and study support through the Bonneville Power Administration's cluster process under Attachment L of its Open Access Transmission Tariff.
Review the full module descriptionPSS/E, PSCAD and ASPEN short-circuit model packages and study support through PacifiCorp's annual Cluster Study Process, built to PacifiCorp's modeling business practice, from the Cluster Request Window to commercial operation.
Review the full module descriptionModel packages, inverter-based resource business practice milestones and study support through Arizona Public Service's Cluster Study, from the Cluster Request Window to first-year model validation.
Review the full module descriptionEvent analysis
Values pulled from the recordings exactly; the engineer rules on the gray areas and signs the report.
Ride-through performance during real grid events analyzed against the standard from plant recordings.
Review the full module descriptionGeneration losses found in your plant data and compared with the reporting threshold for your Interconnection, with each report tracked from clock start to submission.
Review the full module descriptionCold weather derates and outages found in your plant data, checked against each unit's Extreme Cold Weather Temperature, and the corrective action plan timetable tracked.
Review the full module descriptionRelay, fault recorder, and plant operating data delivered, read, and grouped into one event per incident, with what each record shows and what to do next.
Review the full module descriptionRecordings from your plant's transmission-connected elements checked against the standard's disturbance monitoring data requirements, and every gap recorded with its cause and fix.
Review the full module descriptionEvery relay trip at your plant screened for a possible Misoperation, the 120-day determination clock started, and the investigation and corrective action plan tracked to closure.
Review the full module descriptionDisturbance records from your synchronous plant checked against the standard's no-trip zones, with any trip inside them analyzed and corrected.
Review the full module descriptionEach fault record from your plant checked against the standard's fault recording requirements, and every gap recorded with its cause, corrective action, and evidence.
Review the full module descriptionQualifying changes in your plant's real power output detected, and the event analysis and corrective action plans tracked to closure.
Review the full module descriptionMore event modules are in development.
Forward Deployed
The same engineers, in your systems, every week.
Day-to-day compliance operations on your behalf: evidence collection, self-certification support, audit preparation and regulatory change response across your registered scope.
Review the full module descriptionOngoing engineering and modeling for operating plants: model updates, test reruns, study updates and studies triggered by regulatory or site changes.
Review the full module descriptionTell us the plant and the deadline. An engineer will map it to the modules and tell you what we need from you.