Modules · Interconnection studies · Module 048
Modeling and support through every phase of an ERCOT interconnection request, from application to energization.
About this module
This package covers modeling and support for one or more interconnection requests in the Electric Reliability Council of Texas (ERCOT) region. Navigating the interconnection process correctly requires engineering expertise in how to design, build and plan across each phase of the process. The package supports you through the four stages of the Generation Interconnection or Change Request (GINR) process.
Module: 048
Kind: Interconnection studies
Governing body: ERCOT
Applies to: Before and after commercial operation
Typical time: Follows the ERCOT interconnection calendar
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.