Standards

The FERC Order 901 standards, done the same way for every plant.

FERC Order No. 901, issued in October 2023, directed NERC to write new reliability standards for inverter-based resources. PRC-029-2 ride-through and PRC-030-1 event mitigation are the first of that wave of standards written for a power-electronics grid. GridStrong takes every plant through each of them the same way, with the same inputs, the same steps and the same evidence, so nothing is left to chase.

PRC-029-2 · Ride-through

Every plant evaluated the same way, before the deadline.

PRC-029-2 requires Generator Owners to show that inverter-based resources ride through voltage and frequency disturbances: ride-through capability, current and power priority settings, active power recovery, and the documentation to prove it. It applies to solar, wind, storage and hybrid plants: the design requirements apply to BES resources from October 1, 2026 and to applicable non-BES resources from January 1, 2027. Once PRC-028-1 disturbance monitoring is in place, it also carries ongoing operational obligations.

Method

Analysis and modeling together

As-left inverter, turbine and relay settings are extracted from the source files, the ride-through curve is built from them, and sixteen tests independently model and verify each Requirement and Part of the standard.

Timing

Start before the OEM answers

The evaluation starts with what exists today, determines whether an exemption is required, and takes future OEM firmware into account as a revision rather than a restart.

Scope

One study, not four

The same evaluation flags whether a TOV study, an insulation coordination review or a PRC-019 study is now triggered, so related work is scoped once.

What the evaluation needs from you

  • Protection settings: as-left inverter or turbine settings, as-left relay settings, PRC-019 and PRC-024 reports, protection philosophy and narrative
  • Ride-through settings: inverter or turbine technical manuals, as-left ride-through settings, control narratives
  • Model quality: MOD-026 and MOD-027 reports, single-line diagrams, model quality test reports, user guides for user-defined models
  • Model components: aggregated inverter or turbine model and step-up transformer, equivalent collector system, shunt compensation, main power transformers with tap changers, voltage-based protection at the unit and the plant, power plant controller
Exemptions

For plants that cannot meet a requirement because of hardware limits, the exemption is prepared as part of the same evaluation: technical justification, documented limitation, engineering analysis, and submittal to the Planning Coordinator, Transmission Planner, Transmission Operator, Reliability Coordinator and Compliance Enforcement Authority. Plants in service by October 1, 2026 whose owners were already responsible for compliance submit by October 1, 2027. PRC-029-2 also opens the exemption to qualifying long-lead projects that enter service later, on a 90-day track.

PRC-030-1 · Unexpected event mitigation

Events found, analyzed and closed without anyone watching a screen.

PRC-030-1 is NERC's standard for unexpected changes in Real Power output from inverter-based resources. Generator Owners with BES-connected plants, and certain non-BES plants above capacity thresholds, must identify qualifying events, analyze each one, and mitigate performance issues through Corrective Action Plans or technical justification. Ride-through sets the performance requirement; PRC-030-1 governs what happens after the event.

Detection

Flagged with the evidence

Plant SCADA, historian, PMU, SER and DFR data come into the Dashboard, your thresholds are applied, and qualifying events are flagged and logged. Nobody waits for a disturbance report.

Analysis

The same way, every time

Characterize the event, document ride-through performance, capture reactive response, record root cause. Consistent across plants, units and OEMs, and ready for the RC, BA or TOP when they ask.

Corrective action

Open items in plain sight

Corrective Action Plans are created, assigned and tracked in the record, with OEM coordination and implementation status visible at the fleet level.

PRC-028-1 · Disturbance monitoring

The assessment that took six weeks now takes a day.

PRC-028-1 requires sequence-of-events, fault and dynamic disturbance recording at inverter-based plants, and the documentation that proves each recorder captures what the standard requires. GridStrong builds the plant's equipment record from its own files, assesses every requirement against it, and cites the page behind every answer.

23 h
first look to delivered assessment
~550
requirements assessed in 31 minutes
~1,100
cited sources behind the answers

Read the Texas solar plant case study

Common questions

Three questions every compliance lead asks.

How is this different from hiring a consultant?

The old way aggregates files from departments and OEMs into a file share, then trades spreadsheet versions over email for weeks. In GridStrong the whole process runs in the software, with our engineers alongside yours, fixed pricing, live status, and the data stored so the next standard reuses it.

Does it work with our existing compliance program?

Yes. The Dashboard connects to your current documentation systems during migration and takes over the trackers and spreadsheets plant by plant, so nothing stops working while it moves. Your teams, procedures and modeling tools come with it.

What about the other standards?

PRC-019, PRC-024, MOD-025, MOD-026, MOD-027, MOD-032 and the ISO and regional variants run on the same record with the same evidence model. 135,000 grid-code requirements across North America are indexed to the page and mapped to each plant.