Modules · Event analysis · Module 081
Each fault record from your plant checked against the standard's fault recording requirements, and every gap recorded with its cause, corrective action, and evidence.
About this module
PRC-028-1 requires each Generator Owner of an inverter-based resource (IBR) to have fault recording data that captures the required electrical quantities at the high side of the main power transformer, on collector feeder breakers, and on shunt dynamic reactive devices (R2); that meets the required record length, a minimum recording rate of 64 samples per cycle, and the required trigger settings (R3); that is time synchronized to Coordinated Universal Time (UTC) (R6); and that can be provided on request in comma-separated values (CSV) or Institute of Electrical and Electronics Engineers (IEEE) C37.111 Common Format for Transient Data Exchange (COMTRADE) format, revision C37.111-1999 or later (R7). On discovering a failure of recording capability, the Generator Owner must restore it within 90 calendar days or submit a Corrective Action Plan to the Regional Entity (R8).
This module checks every COMTRADE record from your plant against those requirements and, when a check fails, records the finding, its root cause, the corrective action and schedule, and the evidence in an event review workflow and report tied to the recording.
Module: 081
Kind: Event analysis
Governing body: NERC
Applies to: Operating plants
Typical time: Days per event, not weeks
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.