Modules · Modeling studies · Module 071

PSS/E Plant Model Development

A PSS/E plant model built from the OEM unit and plant controller models and your site's electrical data.

About this module

What this module covers.

The PSS/E model of your inverter-based resource (IBR) plant is developed using the original equipment manufacturer (OEM)-supplied IBR unit and power plant controller (PPC) models, and the electrical parameters (generator step-up transformer, collector equivalent, main power transformer, tie line, etc.) of the site to build an IBR plant representation. Site-specific details and one-line diagrams can be used as a starting point for the effort.

At a glance

Module: 071
Kind: Modeling studies
Governing body: Any region
Applies to: Before and after commercial operation
Typical time: Two to three weeks, all in, including your review

Dashboard capabilities

  • PSS/E Model Build Wizard
  • Model Workspace Management: your plant's simulation model files kept in one dashboard workspace, with version tracking

Support services

What GridStrong does inside this module.

  • Develop the PSS/E model of the site based on the electrical parameters of the IBR plant and the OEM-supplied models.
  • Configure the PSS/E model with compliant settings.
  • Test and verify that the model functions properly and adequately meets basic model acceptance criteria.

Final deliverables

  • The aggregate PSS/E model package of the IBR plant and corresponding documentation that describes the model.

What we need from you

  • Single-line diagram of the plant (electrical layout: generator step-up transformer, collector, main power transformer, tie line, etc.).
  • OEM-supplied dynamic models for the IBR units and the power plant controller.
  • Electrical parameters for the major equipment (transformer ratings/impedances, line lengths, collector equivalents).
  • Site-specific operating limits (point of interconnection voltage, MW/MVAR ratings, ride-through and trip settings).

Assumptions and considerations

How the scope is bounded.

Run this module on one site.

Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.