We are hiringCome build the future of the grid with us.Find your role

Modules · Modeling studies · Module 062

ERCOT Primary Frequency Response Verification

Measured governor response laid over the simulated model response, with a cited verdict for the verification package.

About this module

What this module covers.

Verifies your plant's Primary Frequency Response (PFR) governor model - droop, deadband, and rolling Real Power Frequency Response (RPFR) behavior - against staged frequency-disturbance test results, per ERCOT Nodal Operating Guide (NOG) Section 2.2.7 and Nodal Protocols Section 8.5. The workflow overlays the measured governor response against the simulated model response and produces a citation-backed verdict for the parameter verification package.

At a glance

Module: 062
Kind: Modeling studies
Governing body: ERCOT
Applies to: Operating plants
Typical time: Two to three weeks, all in, including your review

Dashboard capabilities

  • Automated Compliance Workflow for ERCOT PFR (NOG Section 2.2.7; Nodal Protocols Section 8.5)
  • Model Workspace Management: your plant's simulation model files kept in one dashboard workspace, with version tracking
  • PSS/E Simulations
  • PSCAD Simulations
  • Measured-vs-simulated governor-response overlay

Support services

What GridStrong does inside this module.

  • Receive the staged primary frequency response test data and the governor settings in force at the time of the test.
  • Verify the governor model (droop, deadband and rolling RPFR behavior) against the measured response.
  • Overlay the measured governor response against the simulated model response and record the verdict with its citations.

Final deliverables

  • PFR model verification report for the parameter verification package, with the measured-versus-simulated overlay and verdict.

What we need from you

  • Staged frequency-disturbance test recordings.
  • Governor and plant controller frequency response settings.
  • PSS/E and PSCAD models of the plant.

Assumptions and considerations

How the scope is bounded.

Run this module on one site.

Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.