Interconnection studies, modeling data and Model Verification for data-center sites under NERC's proposed CLO-001-1, including the duties of a Generator Owner whose plant connects one.
About this module
The new CLO-001-1 standard (Computational Load Interconnection, Studies, & Modeling Data) applies to Computational Load Sites with a total connected Load of 50 MW or more supplied through electrical equipment connected at 100 kV or above from one or more points of connection. A Computational Load Site is one or more buildings, structures, or installations at a single location that primarily contains information technology infrastructure used for creating, executing, and delivering software applications and services, artificial intelligence training, deployment, and delivery, cryptocurrency mining, or other computational activities at a data center, and that is supplied through electrical equipment connected to the Bulk-Power System. The Computational Load Owner (CLO) must coordinate and cooperate with the Transmission Owner, Generator Owner, Distribution Provider, and Transmission Planner or Planning Coordinator on interconnection studies for new sites and for existing sites seeking a qualified change as defined by the Planning Coordinator, including providing study data (R5). The CLO must provide steady-state, dynamics, and short-circuit modeling data to its Transmission Planner and Planning Coordinator according to their data requirements and reporting procedures, with a written confirmation sufficing for unchanged data (R9); respond to written technical concerns about that data within 90 calendar days, or a longer period the notifying Planning Coordinator or Transmission Planner agrees to, with updated data or a technical explanation (R10); and provide Model Verification documentation showing that the configurable, site-specific model parameters represent the design and settings of the in-service equipment, initially within 365 calendar days after the in-service date, within 180 calendar days after a hardware, software, firmware, or setting change that alters the dynamic response, and subsequently within 10 calendar years of the most recent transmittal (R11). A Generator Owner that fully executes an Agreement to study interconnecting a Computational Load Site to its existing Facility used to interconnect to the Transmission system must document Computational Load Site interconnection requirements, including procedures for coordinating with the applicable Transmission Owner and Distribution Provider, and make them available on request within 45 calendar days of full execution of a study Agreement (R3), and must coordinate and cooperate with its Transmission Planner or Planning Coordinator on studies of those interconnections, including providing data (R6).
CLO-001-1 is pending FERC approval; FERC has directed NERC to file computational load Reliability Standards by December 31, 2026. If FERC approves it, the standard becomes effective in the United States on the first day of the first calendar quarter after the effective date of FERC's approval order, or as FERC otherwise provides. The implementation plan phases compliance: the Planning Coordinator and Transmission Planner requirements (R7, R8) at 3 months, the Transmission Owner, Distribution Provider, and Generator Owner interconnection requirements (R1-R3) at 6 months, and the study, modeling data, technical-concern, and Model Verification requirements (R4-R6, R9-R11) at 9 months after the effective date.
This module covers digitizing the preparation of compliance procedures, study and modeling data submissions, and Model Verification documentation to support compliance preparedness for NERC CLO-001-1.
Module: 085
Kind: Compliance studies
Governing body: NERC
Applies to: New and in-service sites
Typical time: Follows the standard's clocks