Modules · Modeling studies · Module 038
ERCOT's revised voltage and frequency ride-through requirements evaluated for new and existing inverter-based resources and wind plants.
About this module
Nodal Operating Guide Revision Request (NOGRR) 245 revised the ERCOT Nodal Operating Guide to significantly change the voltage and frequency ride-through requirements for transmission-connected inverter-based resources (IBRs) and Type 1 and Type 2 wind-powered generation resources (WGRs) in the ERCOT system. The requirements exceed IEEE 2800-2022 in some ways and apply to new IBRs as well as existing IBRs operating in ERCOT. NOGRR 245 requires Resource Entities to "maximize" their ride-through capability, including every software-based update available to them, and to report that capability to ERCOT in the Initial Frequency Ride-Through Capability Report (IFRTCR) and Initial Voltage Ride-Through Capability Report (IVRTCR). ERCOT set the reporting deadline at April 1, 2025, with subsequent actions required by December 31, 2025 unless an extension or exception was granted; both dates have passed. This module covers the ongoing NOGRR 245 compliance assessment workflow, including the response to ERCOT Market Notice M-A010825-06 (the NOGRR 245 ride-through capability request for information), the IFRTCR and IVRTCR capability reports, and exemption or extension request support.
Module: 038
Kind: Modeling studies
Governing body: ERCOT
Applies to: Operating plants
Typical time: Two to three weeks, all in, including your review
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.