PRC-026-2 Relay Performance During Power Swings

Evaluation of relay performance during stable power swings on notification from the Planning Coordinator or after a trip.

About this module

What this module covers.

This module develops your compliance procedure for NERC PRC-026-2, Relay Performance During Stable Power Swings, and applies it at each applicable plant. PRC-026-2 requires the Generator Owner, upon notification from its Planning Coordinator (or after a BES Element trip in response to a stable or unstable power swing), to evaluate within 12 full calendar months whether its load-responsive protective relays meet the Attachment B criteria, and if not, to develop a Corrective Action Plan within 6 full calendar months and implement it on the CAP's timetable. This module covers development of the compliance procedure and implementation at each applicable plant.

At a glance

Module: 027
Kind: Compliance studies
Governing body: NERC
Applies to: Operating plants
Typical time: About one week, all in

Dashboard capabilities

  • Automated Compliance Workflow for PRC-026-2
  • PSS/E Simulations

Support services

What GridStrong does inside this module.

Task 1: Develop Compliance Procedure

  • Create an audit-ready compliance procedure for meeting the PRC-026-2 requirements, working collaboratively across engineering and compliance departments. This includes:
    • Identifying applicable assets, functions, SMEs, roles, responsibilities, and ownership
    • Determining specific actions and evidence to demonstrate compliance with specific requirements and measures
    • Conduct a gap analysis comparing current practices versus the standard requirements
    • Develop clear step-by-step procedures for PRC-026-2 that align with internal controls and documentation policies, including Attachment B evaluations and CAP development
    • Establish compliance timelines that align with standard implementation deadlines (12-month evaluation, 6-month CAP)
    • Define and determine specific compliance evidence per site

Task 2: Implementation of Compliance Procedure at each plant

  • Gather all applicable documentation, models, data, etc. for each applicable plant, including PC notifications, relay settings, and BES Element trip history
  • Conduct a thorough review of all existing plant data and documentation, perform the Attachment B evaluation, and compare against standard requirements
  • Recommend changes needed to meet NERC PRC-026-2 requirements, including any CAPs to modify relay settings or apply power swing blocking / power-swing-immune relays
  • Identify and explain the compliance timelines needed to implement recommended changes

Final deliverables

  • Compliance procedure for PRC-026-2.
  • Completed PRC-026-2 Attachment B Evaluation Forms per applicable BES Element.
  • Compliance report per applicable plant documenting methodology, findings, and recommendations.

What we need from you

  • PC notification identifying BES Elements that meet the PRC-026-2 R1 criteria.
  • Your load-responsive protective relay settings, apparent impedance characteristics, and relay models for applicable generators, transformers, and transmission lines.
  • Historical BES Element trip records in response to power swings.

Assumptions and considerations

How the scope is bounded.

  • You supply all required documentation and access to engineering SMEs.
  • We will use engineering judgment and best practices to support compliance preparedness.