Modules · Compliance studies · Module 027
Evaluation of relay performance during stable power swings on notification from the Planning Coordinator or after a trip.
About this module
This module develops your compliance procedure for NERC PRC-026-2, Relay Performance During Stable Power Swings, and applies it at each applicable plant. PRC-026-2 requires the Generator Owner, upon notification from its Planning Coordinator (or after a BES Element trip in response to a stable or unstable power swing), to evaluate within 12 full calendar months whether its load-responsive protective relays meet the Attachment B criteria, and if not, to develop a Corrective Action Plan within 6 full calendar months and implement it on the CAP's timetable. This module covers development of the compliance procedure and implementation at each applicable plant.
Module: 027
Kind: Compliance studies
Governing body: NERC
Applies to: Operating plants
Typical time: About one week, all in
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.