Modules · Event analysis · Module 079
Every relay trip at your plant screened for a possible Misoperation, the 120-day determination clock started, and the investigation and corrective action plan tracked to closure.
About this module
PRC-004-6 requires each Transmission Owner, Generator Owner, and Distribution Provider that owns a Bulk Electric System (BES) interrupting device that operated to identify, within 120 calendar days of the operation, whether its Protection System component or components caused a Misoperation (R1); to notify the other owner or owners of a shared Composite Protection System within the same 120 calendar days (R2); to identify, when notified, whether its own components caused a Misoperation (R3); within 120 calendar days of first identifying a Misoperation, to identify its cause or carry an investigation plan until the cause is found (R4); within 60 calendar days of first identifying a cause, to develop a Corrective Action Plan (CAP) and evaluate its applicability to the entity's other Protection Systems, or explain in a declaration why corrective actions are beyond the entity's control (R5); and to implement each CAP, updating it if actions or timetables change, until completed (R6).
This module screens every relay event record from your plant for a Protection System operation, starts the 120-day clock for the devices you own, and carries each operation through determination, notification, cause, and CAP in one workflow. It also covers development of your compliance procedure and support for each investigation.
Module: 079
Kind: Event analysis
Governing body: NERC
Applies to: Operating plants
Typical time: Days per event, not weeks
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.