Modules · Interconnection studies · Module 089
PSS/E and PSCAD model packages and study support through PJM's Cycle process under Manual 14H, from the Application Phase and Decision Points I to III to the Generation Interconnection Agreement and commercial operation.
About this module
This package covers modeling and support for one or more interconnection requests in the PJM Interconnection (PJM) region. PJM studies new generation and storage requests in a cluster-based Cycle process under Tariff Part VIII and Manual 14H, where each Cycle consists of the Application Phase, Phase I, Decision Point I, Phase II, Decision Point II, Phase III, Decision Point III and the Final Agreement Negotiation Phase. PJM requires a PSS/E dynamic model package with the application and, from Cycle 01 onward, a PSCAD model at Decision Point II, each built and tested to PJM's own guidelines. Navigating this process correctly requires engineering expertise in how to design, model and plan a project across each stage. This package covers five stages, from the application through the Generation Interconnection Agreement (GIA), commercial operation and post-commercial operation model updates.
Module: 089
Kind: Interconnection studies
Governing body: PJM
Applies to: Before and after commercial operation
Typical time: Follows the PJM interconnection calendar
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.