Modules · Interconnection studies · Module 096

TVA Interconnection Module Package

PSS/E and PSCAD model packages and study support through the Tennessee Valley Authority's Cluster Study Process, built to its Modeling Requirements Revision 5, from the Cluster Request Window to post-commercial-operation model evaluations.

About this module

What this module covers.

This package covers modeling and support for one or more interconnection requests to the Tennessee Valley Authority (TVA) transmission system. TVA publishes its own Standard Large Generator Interconnection Procedures (LGIP) for Generating Facilities of more than 20 MW, effective November 1, 2024, which TVA states substantially align with Federal Energy Regulatory Commission (FERC) Order No. 2023. Under the LGIP, a new request moves through the Cluster Study Process in sequence: the annual Cluster Request Window, the Customer Engagement Window and its Scoping Meeting, the Cluster Study, any Cluster Restudies, and the Interconnection Facilities Study, followed by the Standard Large Generator Interconnection Agreement (LGIA), Trial Operation and Commercial Operation. For inverter-based resources (IBR), TVA Modeling Requirements Revision 5 requires a PSS/E benchmark case, generic and user-defined PSS/E dynamic models, a PSCAD electromagnetic transient (EMT) model and completed PSS/E and PSCAD Modeling Reports with the Interconnection Request, updated models at the Post-Construction/Backfeed, 14-day Burn-In and Post-COD As-Built Package stages (COD is the Commercial Operation Date), and periodic model evaluations for the life of the plant. This package supports you through each of the five stages below, from the Interconnection Request through post-Commercial Operation model updates.

At a glance

Module: 096
Kind: Interconnection studies
Governing body: TVA
Applies to: Before and after commercial operation
Typical time: Follows the TVA interconnection calendar

Dashboard capabilities

  • Model Workspace Management: your plant's simulation model files kept in one dashboard workspace, with version tracking
  • PSCAD Simulations
  • PSS/E Simulations

Support services

What GridStrong does inside this module.

Stage 1: Cluster Request Window and Customer Engagement Window

  • Support you in preparing the Interconnection Request (LGIP Appendix 1 and its Attachment A workbook) for submittal through TVA's IC Portal within the annual Cluster Request Window, including the Generating Facility Capacity, the requested Interconnection Service level, the choice of Energy Resource or Network Resource Interconnection Service, and the Point of Interconnection. We prepare the technical content; you submit.
  • Develop the plant-specific PSS/E version 35 benchmark case required by TVA Modeling Requirements Revision 5 Section 2.1.1, with equipment data matching the Interconnection Request, the original equipment manufacturer (OEM) de-rate curves for temperature and elevation, and the system equivalent generator and Thevenin branch set to the short circuit ratio TVA specifies at the Point of Interconnection.
  • Develop plant dynamic models per TVA Modeling Requirements Section 2.1.2: for inverter-based resources, both the OEM user-defined models with compiled .dll files and the second-generation generic renewable models (REGCAU1, REECAU1 or REECCU1, REPCAU1, or PLNTBU1 with REAX_BU1 for hybrid plants), each in its own DYRE file, plus models of any static var compensator (SVC) or static synchronous compensator (STATCOM); for synchronous resources, PSS/E generator, exciter, power system stabilizer and governor models with a report listing the models and their parameter settings.
  • Perform the simulations TVA Modeling Requirements Section 2.1.3 requires with both the generic and the user-defined models at a quarter-cycle time step (no-disturbance drift run and bolted three-phase fault at the Point of Interconnection for each applicable solar, wind and storage operating scenario), produce the simulation output files, and complete the TVA Modeling Requirements Appendix I checklist.
  • Coordinate with inverter, turbine and plant controller manufacturers on the plant-specific PSCAD EMT model you obtain from them, compatible with PSCAD version 5 or higher, with the user manual, sample implementation test case, OEM statement of acceptable time steps and settings identification TVA requires in Modeling Requirements Section 2.1.4.
  • Run the TVA Modeling Requirements Appendix III Model Quality Checks on the PSCAD model (drift run, time step checks, voltage step checks, frequency step checks, and three-phase-to-ground and two-phase-to-ground disturbance tests at a short circuit ratio (SCR) of 3 and X/R of 5) and complete TVA's PSS/E and PSCAD Modeling Report templates.
  • Benchmark the generic, user-defined and PSCAD models against each other for the same disturbances, and collect the OEM model benchmarking report and the user-defined and EMT model user manuals TVA Modeling Requirements Appendix II lists.
  • Run TVA's optional self-check Model Tools (the IBRDC_Hammer PSS/E script and the TVA PSCAD Test Module) before submittal, and prepare the package for TVA's Optional Pre-Application Review when you elect it.
  • For Generating Facilities with storage, document the requested charging operating assumptions and the control technologies that will hold the plant to them.
  • Support you at the Scoping Meeting on alternative Points of Interconnection and configurations, refine data and models, respond to TVA deficiency notices, and update models for modifications the LGIP permits before the Cluster Study Agreement is returned.

Stage 2: Cluster Study, Cluster Restudy and Interconnection Facilities Study

  • Review the Cluster Study Report and any Cluster Restudy Reports (power flow, stability, short circuit, EMT and reactive power capability results) against the plant models, using the study databases TVA provides on request, and identify plant-side mitigation such as control tuning or reactive devices.
  • Develop a detailed collector system load flow model and perform a reactive capability study against LGIA Article 9.6.1.
  • Support you at each decision point: remaining in the Cluster after the Cluster Study Report Meeting and each Cluster Restudy Report Meeting, and executing the Interconnection Facilities Study Agreement with the required technical data.
  • Prepare revised steady-state data, single-line diagram and dynamic models for modifications permitted before the Interconnection Facilities Study Agreement is returned, including technological advancement requests under LGIP Section 4.4.6.
  • Review the technical content of the draft Interconnection Facilities Study Report and prepare comments for you to submit.
  • Respond to TVA data requests on the plant models throughout the studies.

Stage 3: LGIA, Construction and Backfeed

  • Review the technical requirements in LGIA Appendix C (Interconnection Details), including voltage regulation, power factor, primary frequency response, ramp rate, grounding and protection, against the plant design and models.
  • Review inverter and plant protection settings and the plant's voltage and frequency ride-through capability curves at the Point of Interconnection against LGIA Article 9.7.3, LGIA Appendix C and the No Trip Zones in TVA ESF Interconnection Requirements Rev 0002 Sections 3.4 and 3.5.
  • Prepare the updated information submission of LGIA Article 24.3, including the completed Appendix 1 data and stability models compatible with TVA standard models, and develop a standard model where no compatible model exists if TVA and you agree on us as the consultant.
  • Update the generic and user-defined PSS/E models and the PSCAD EMT model to as-designed plant data and settings for the Post-Construction/Backfeed stage, with inverter and plant controller setting sheets, a Plant Controls Narrative, the Appendix IV PSCAD Model Quality and Performance Tests (the Appendix III tests with disturbance tests at an SCR of 3 and X/R of 5 and at the actual site all-ties-closed and strong-source-out conditions, plus ride-through, SCR change and voltage protection tests), and the inverter short circuit and harmonic source data, for submittal before backfeed per TVA Modeling Requirements Section 2.2 and the IBR Commissioning Guidelines, and no later than LGIA Appendix C Section 6.2 requires.
  • Compile transformer test report data, including zero sequence impedance and the main step-up transformer no-load test results, and the as-built gen-tie, collector system and ground grid design data TVA requires for the short circuit, grounding and EMT power quality models.

Stage 4: Trial Operation, Commissioning, 14-Day Burn-In and Commercial Operation

  • Update the generic, user-defined and PSCAD models with the parameters tuned during commissioning (as-designed-with-modifications) for the 14-day Burn-In stage, update the Plant Controls Narrative, and compile the inverter and plant controller OEM attestation reports and the plant model attestation report TVA Modeling Requirements Section 2.3 requires, for submittal before the scheduled Commercial Operation Date.
  • Support the modeling review TVA requires to pass before granting the Commercial Operation Date.
  • Support the commissioning performance tests TVA performs or observes under its IBR Commissioning Guidelines (primary frequency response, harmonic distortion, reactive power capability, voltage flicker, voltage step and, during the 14-day burn-in, voltage regulation, plus the battery energy storage system (BESS) capacity and interoperability tests), the reactive capability testing of LGIA Appendix C Section 4.4.4 and, for synchronous units, the open circuit step voltage test under LGIA Article 24.4.
  • Prepare the as-built and as-tested information LGIA Article 24.4 requires before the Operation Date, then validate the generic, user-defined and PSCAD models against commissioning test data and deliver the Post-COD As-Built Package (validated as-built models, model validation report and final OEM model benchmarking report) after the Commercial Operation Date per TVA Modeling Requirements Section 2.4.
  • Prepare the MOD-025, MOD-026, MOD-027, MOD-032 and PRC-024 model and data submittals on TVA's Interconnection Customer NERC (North American Electric Reliability Corporation) Compliance Checklist for you to submit before the Commercial Operation Date; the TVA checklist still cites MOD-027-1, which MOD-026-2 replaced on April 1, 2026.

Stage 5: Post-COD Periodic Model Evaluations

  • Update the generic, user-defined and PSCAD models and setting sheets after changes to equipment, settings, firmware or protection, which you coordinate with TVA before implementing, and validate the models against system event data and in the five-year periodic verification and validation TVA Modeling Requirements Section 2.5 requires, for you to submit to TVA.
  • Support you in evaluating plant changes that would require a new Interconnection Request for a capacity increase or Material Modification, or a Surplus Interconnection Service request, and prepare the updated models.

Final deliverables

  • Stage 1: Interconnection Request technical package: PSS/E version 35 benchmark case (RAW or SAV) with IDEV files for the other storage scenarios, generic and user-defined DYRE dynamic model files with the compiled user-defined model files, simulation output files for both model sets and the completed TVA Modeling Requirements Appendix I checklist, PSCAD EMT model package with user manual and sample test case, completed TVA PSS/E and PSCAD Modeling Reports with the Appendix III Model Quality Check results, PSS/E-to-PSCAD benchmark report, and storage operating assumptions description where applicable.
  • Stage 2: Study review memo for each Cluster Study Report and Cluster Restudy Report; reactive capability study report; updated models and data for permitted modifications or technological advancement requests; technical data for the Interconnection Facilities Study Agreement; comments on the draft Interconnection Facilities Study Report.
  • Stage 3: LGIA Article 24.3 updated information package; Post-Construction/Backfeed model package (as-designed generic, user-defined and PSCAD models, inverter and plant controller setting sheets, Plant Controls Narrative, Appendix IV PSCAD test results, short circuit and harmonic data); LGIA Appendix C and ESF Interconnection Requirements technical review memo; transformer, gen-tie and collector system data compilation.
  • Stage 4: As-designed-with-modifications and 14-day Burn-In model updates with the updated Plant Controls Narrative and the OEM and plant model attestation reports; commissioning test support report; NERC Compliance Checklist model and data submittals; Post-COD As-Built Package with validated as-built PSS/E and PSCAD models, model validation report and final OEM model benchmarking report.
  • Stage 5: Updated models and setting sheets after each plant change; event-based and five-year periodic model validation reports; technical package for any new Interconnection Request or Surplus Interconnection Service request.

What we need from you

  • Project information for the Interconnection Request: Generating Facility Capacity, requested Interconnection Service level and type (Energy Resource Interconnection Service, ERIS, or Network Resource Interconnection Service, NRIS), Point of Interconnection, location and expected In-Service Date.
  • Single-line diagram, general site plan, and equipment data and specification sheets.
  • Inverter or turbine data: PQ capability curve, OEM de-rate curves for temperature and elevation, datasheets, OEM PSS/E generic model parameters and user-defined model with compiled .dll files, OEM PSCAD model with manual, black-box libraries and acceptable time-step range, OEM model benchmarking report, and firmware and control revision codes.
  • Plant controller data and settings, including voltage control, frequency response and output limiting.
  • Main power transformer, generator step-up and station service transformer data and manufacturer test reports with zero sequence impedance; collector system, gen-tie and capacitor bank data; station service load.
  • Inverter and plant protection settings (voltage, frequency and overcurrent).
  • Before backfeed: OEM inverter short circuit contribution tables (positive and negative sequence), harmonic Thevenin or Norton source data, and as-built gen-tie (tower configuration, conductor spacing and type), collector system and ground grid design data.
  • After commissioning: inverter and plant controller OEM attestation reports and the commissioning test records used for model validation.
  • For storage: requested charging operating assumptions and the limiting control technologies.
  • For synchronous units: generator, exciter, power system stabilizer and governor data and models.
  • Study reports, Base Case data and study databases TVA releases to you, subject to TVA confidentiality terms.

Assumptions and considerations

How the scope is bounded.

  • This module covers the LGIP Cluster Study Process that TVA applies to requests submitted on or after November 1, 2024. The transitional serial and transitional cluster studies apply only to requests queued before November 1, 2024 and are not covered.
  • This module covers Large Generating Facilities of more than 20 MW under the LGIP. TVA's Small Generator Interconnection Procedures, TVA's Expedited Resource Addition Study (ERAS) and any Resource Solicitation Cluster TVA initiates follow separate terms and are not covered.
  • We provide the models compatible with the versions named in TVA Modeling Requirements Revision 5 (May 2025): a PSS/E version 35 benchmark case, dynamic models compatible with PSS/E versions 33 and 35, and PSCAD version 5 or higher with 32-bit Intel Visual Fortran, or later versions TVA confirms in writing.
  • For inverter-based resources, dynamic models include both the OEM user-defined models and the second-generation generic renewable models TVA lists; models NERC classifies as unacceptable or not recommended will not be used.
  • Passing TVA's self-check Model Tools or its Optional Pre-Application Review does not guarantee that TVA deems the Interconnection Request valid; TVA performs the deficiency check.
  • TVA performs the Cluster Study, Cluster Restudy, Interconnection Facilities Study and LGIA-stage studies. We prepare the data, models and comments; you submit all requests, agreements and deposits.
  • We rely on you for timely and accurate information, including OEM and engineering, procurement and construction (EPC) data; we assume no responsibility or liability for the accuracy of information supplied by you or your suppliers.
  • We do not guarantee the accuracy or quality of any models supplied by the OEMs.
  • This scope includes one round of corrections with the OEMs and EPC contractors per model deliverable; further rounds are additional support, approved in writing.
  • We use engineering judgment and best practices where TVA requirements or OEM data are incomplete.

Run this module on one site.

Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.