Modules · Modeling studies · Module 031
Coordination of voltage regulating controls, limit functions, equipment capability and protection settings for each inverter-based plant.
About this module
NERC PRC-019-2 requires Generator Owners and Transmission Owners of synchronous condensers to verify coordination of generating unit facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and protection system settings.
This module performs the technical studies that develop your PRC-019-2 compliance evidence for each inverter-based resource (IBR) plant and coordinates the work, so that each plant's voltage regulation controls, limit functions and equipment capability are coordinated.
Module: 031
Kind: Modeling studies
Governing body: NERC
Applies to: Operating plants
Typical time: Two to three weeks, all in, including your review
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.