Modules · Interconnection studies · Module 098

BPA Interconnection Module Package

PSLF, ASPEN OneLiner and PSCAD models, commissioning test support and study support through the Bonneville Power Administration's cluster process under Attachment L of its Open Access Transmission Tariff.

About this module

What this module covers.

This package covers modeling and support for one or more interconnection requests to connect a Large Generating Facility (more than 20 MW, including electric storage) to the Bonneville Power Administration (BPA) transmission system. BPA studies new requests in clusters under Attachment L of its Open Access Transmission Tariff (OATT), the Standard Large Generator Interconnection Procedures (LGIP), effective October 1, 2025, and its Large Generator Interconnection Business Practice Version 13. A new request joins the Cluster Study that follows the Transition Cluster Study, which BPA begins after the Transition Cluster Study is complete, on at least 180 Calendar Days' notice (the Cluster Request Window for that Cluster Study opened January 27, 2025). The request proceeds through the Phase One Cluster Study, the Phase Two Cluster Study and the Interconnection Facilities Study, and after each cluster phase you must meet the commercial readiness, Site Control, model and technical data requirements of a Customer Review Period to continue. BPA tenders the Standard Large Generator Interconnection Agreement (LGIA) after it completes its National Environmental Policy Act (NEPA) review, and grants Commercial Operation only after the plant passes BPA's voltage and frequency control commissioning tests, you complete electromagnetic transient (EMT) ride-through studies with as-built models, and you answer BPA's modeling data requests. BPA's Technical Requirements for Interconnection to the BPA Transmission Grid (STD-N-000001) and its Interconnection Model Requirements (STD-N-000001-05) set the performance requirements and require models in GE PSLF or PowerWorld, ASPEN OneLiner and PSCAD formats. This package supports you through each of the five stages below, from the Interconnection Request through commissioning and post-commercial-operation model updates.

At a glance

Module: 098
Kind: Interconnection studies
Governing body: BPA
Applies to: Before and after commercial operation
Typical time: Follows the BPA interconnection calendar

Dashboard capabilities

  • Model Workspace Management: your plant's simulation model files kept in one dashboard workspace, with version tracking
  • PSCAD Simulations

Support services

What GridStrong does inside this module.

Stage 1: Interconnection Request and Phase One Cluster Study

  • Prepare the technical content of your Interconnection Request for a Cluster Request Window: the Appendix 1 technical information; the steady-state model of the Large Generating Facility (equivalent plant-level model, equivalent collector system, step-up transformers and generation tie line) in GE PSLF or PowerWorld format; and the GE PSLF .epc and .dyd generator model (not a full base case) that the Large Generator Interconnection Business Practice asks for with the request. You submit the request.
  • For a wind plant that files its Interconnection Request with a single equivalent generator under LGIP Appendix 8, prepare the detailed electrical design specifications and collector system layout data due by the Appendix 8 deadline.
  • Review the plant design and original equipment manufacturer (OEM) selection with you before you sign the Generation Model and Performance Attestation (Attachment A to Appendix 1), against the Technical Requirements Revision 13 requirements that drive equipment choice: the IEEE Std 2800-2022 clauses BPA applies to inverter-based resources, grid-forming control for battery energy storage, reactive power capability at the Point of Interconnection (POI) and the system strength (short-circuit ratio) requirement in Section 6.3.
  • Support you at the Cluster Scoping Meeting held during the Customer Engagement Window and, if you request one after the Cluster Request Window closes, an Individual Scoping Meeting, including questions on the general feasibility of a requested POI.
  • Review the Phase One Cluster Study Report (short circuit analysis, power flow analysis and preliminary Interconnection Facilities and Network Upgrades, performed with BPA's generic performance models) and support you at the Cluster Study Report Meeting.
  • Evaluate the modifications LGIP Section 4.4.1 permits during the first Customer Review Period (output reduction, technology and step-up transformer parameters, interconnection configuration) and update the models for any modification you elect.
  • Develop the validated detailed models BPA requires before the close of the first Customer Review Period (LGIP Section 6.6.2) to the Interconnection Model Requirements checklists: positive-sequence power flow model in GE PSLF (.epc) or PowerWorld (.aux) format with reactive capability curves; positive-sequence transient model in GE PSLF (.dyd) format built from models approved by the Western Electricity Coordinating Council (WECC), including grid-forming inverter models where storage operates in grid-forming mode, with plant-level control other than REPC_B and with relay models for ride-through settings; full-sequence short-circuit model in ASPEN OneLiner version 15 or later; plant-specific EMT model in PSCAD version 5.0.2 or later.
  • Coordinate with inverter, turbine and plant-controller manufacturers to obtain models, parameters and documentation, map field settings to model settings, and collect the manufacturer certification and real-code or hardware-test validation evidence the Interconnection Model Requirements require for EMT models.
  • Run BPA's Interconnection Model Acceptance Tool (PSLF or PowerWorld version) on the positive-sequence models, built in BPA's generator interconnection bus numbering scheme. The tool runs a flat run, voltage sag stability tests, voltage step, reactive limit and frequency step tests that mirror BPA's Required Voltage and Frequency Control Performance Commissioning Tests (STD-N-000001-01), and voltage and frequency ride-through tests. Prepare the optional tool report and input files for your submittal.
  • Benchmark the GE PSLF positive-sequence dynamic model against the PSCAD EMT model for the same voltage, frequency and fault disturbances and document any differences.
  • Prepare the Interconnection Model Requirements facility data package (one-line diagram, transformer data, inverter and turbine data, plant-level voltage and frequency control description, energy storage data, station service).

Stage 2: Phase Two Cluster Study and Interconnection Facilities Study

  • Review the Phase Two Cluster Study Report (stability, short circuit, Network Resource Interconnection Service where requested, and Contingent Facility analysis) and support you at the Cluster Study Report Meeting.
  • Provide modeling support to resolve plant instability or inadequately damped response identified in the Phase Two Cluster Study, including control tuning with the OEMs and updated PSLF and PSCAD models.
  • Prepare the technical data you provide before the close of the Phase Two Customer Review Period (LGIP Section 7.5.2) and evaluate the modifications LGIP Section 4.4.2 permits during that period.
  • Prepare technological advancement requests under LGIP Section 4.4.6 before you return the executed Interconnection Facilities Study Agreement: updated Appendix 1 data, updated PSLF or PowerWorld models, and analysis showing equal or better electrical performance and no reliability concerns.
  • Prepare the technical data form you provide with the Interconnection Facilities Study Agreement (Attachment A to Appendix 4) and draft your written comments on the draft Interconnection Facilities Study report.
  • Prepare your responses to BPA requests for additional technical information during the Phase Two Cluster Study and Interconnection Facilities Study.

Stage 3: LGIA and Construction

  • Review the technical description of the Generating Facility and Interconnection Facilities in the draft LGIA appendices against the study results and the current design.
  • Develop a detailed collector system power flow model and perform a reactive power capability study that evaluates the plant against the reactive power requirements at the POI in the Technical Requirements and identifies any additional reactive compensation needed.
  • Update the models as detailed design advances (final equipment, collector design, transformer test reports, protection settings) and prepare the updated information submission due before Trial Operation under LGIA Article 24.3, with stability models compatible with BPA's standard models.
  • Prepare modification requests under Section I of the Large Generator Interconnection Business Practice for proposed equipment or setting changes. Each request carries the updated Appendix 1, analysis showing equal or better electrical performance, no increase in Interconnection Service and no reliability concerns, and the model package BPA requires: GE PSLF (.epc, .dyd) or PowerWorld (.aux), ASPEN OneLiner (.olr) and PSCAD (.out, .psout).

Stage 4: In-Service (Backfeed), Initial Synchronization and Trial Operation

  • Prepare the Technical Plant Data BPA requires before the In-Service (Backfeed) milestone (BPA standard STD-N-000001-02): maximum output, reactive capability, line impedances and ratings, final plant one-line, machine and control parameters, protective relay settings.
  • Update the plant models with as-built design parameters, field settings and test reports, and prepare the as-built and as-tested information that supplements the LGIA Article 24 submissions before the Operation Date.
  • Perform EMT studies in PSCAD with the as-built models that assess the plant against the disturbance ride-through requirements in the Technical Requirements, and document the results for the evidence you provide under the Generation Model and Performance Attestation before authorization for Commercial Operation.
  • Prepare test procedures for the Required Voltage and Frequency Control Performance Commissioning Tests (T1 voltage reference step, T2a to T2c voltage control at low active power, T3a and T3b frequency control) and format the test recordings into the .xlsx submission BPA requires.
  • Review the test recordings against BPA's requirements R1 to R3 (voltage control, reactive capability at low active power, primary frequency response) and support follow-up testing if BPA does not approve the results.
  • Validate the positive-sequence and EMT models against the commissioning test recordings and update model parameters where the response differs.
  • Support your responses to BPA's MOD-032 and FAC-008 data request forms, which the Technical Requirements require before release for Commercial Operation.

Stage 5: Post-Commercial Operation

  • Deliver as-built power flow, dynamic and EMT models validated to represent the Generating Facility, as the Generation Model and Performance Attestation requires after Commercial Operation, and as-built ASPEN OneLiner short-circuit models per the Interconnection Model Requirements.
  • Screen planned changes to inverters, plant controller settings or firmware, transformers, protection settings or storage capacity against BPA's Qualified Change definition (Technical Requirements Section 14), and update, re-validate and resubmit models when a change alters the equipment response.
  • Prepare the information changes LGIA Article 24.4 requires after equipment replacement, repair or adjustment.
  • Support your responses to BPA's annual MOD-032 data request and to BPA's generator model data and testing requests under North American Electric Reliability Corporation (NERC) MOD-026-2 and BPA's Generator Owner (GO) Model Data Submission Process.
  • Support Generating Facility Repower, Replacement and Surplus Interconnection Service requests with the model data BPA requires: PowerWorld (.aux) or GE PSLF (.epc and .dyd) for Surplus Interconnection Service, GE PSLF (.epc or .dyd) for a Replacement, and the available technical and modeling data for a Repower.

Final deliverables

  • Stage 1: Interconnection Request technical data, steady-state model and GE PSLF .epc and .dyd generator model; validated detailed model package (GE PSLF or PowerWorld power flow, GE PSLF dynamics, ASPEN OneLiner short circuit, PSCAD EMT) with Interconnection Model Requirements documentation; PSLF-to-PSCAD benchmarking report; BPA Model Acceptance Tool report; Phase One Cluster Study Report review memo.
  • Stage 2: Phase Two Cluster Study Report review memo; mitigation study report and updated models where instability is identified; Phase Two Customer Review Period technical data; technological advancement request package where needed; Interconnection Facilities Study data form and comments on the draft report.
  • Stage 3: Reactive power capability study report; updated model package for the LGIA Article 24.3 submission; modification request model packages where needed.
  • Stage 4: Technical Plant Data package; as-built model package; as-built EMT ride-through study report; commissioning test procedures and test data workbook; commissioning test review and model validation report; MOD-032 and FAC-008 data forms.
  • Stage 5: As-built validated models (GE PSLF, PSCAD, ASPEN OneLiner); Qualified Change screening memos and updated models; MOD-032 and model data request responses.

What we need from you

  • Project information: facility name, expected Commercial Operation Date, Energy Information Administration (EIA) plant code if known, requested POI bus name and voltage, latitude and longitude, county and state, seasonal Interconnection Service and Generating Facility Capacity, and Energy Resource Interconnection Service (ERIS) or Network Resource Interconnection Service (NRIS) election.
  • Electrical one-line diagram showing collector system, transformers, shunt and dynamic reactive devices, breakers and disconnects, station service and generation tie line.
  • Inverter, turbine and energy storage data: number, type, manufacturer, model, firmware, nameplate ratings, temperature and elevation derate curves, inverter loading ratio, storage energy capacity, charge and discharge limits, and grid-charging plan.
  • Transformer data and manufacturer test reports for main, step-up and unit transformers: impedance, X/R ratio, winding configuration, zero-sequence data, fixed taps and on-load tap changer settings.
  • Collector system and tie line lengths with positive- and zero-sequence impedances.
  • OEM GE PSLF dynamic models and parameters; OEM PSCAD models with user manuals, settings mapping and manufacturer certification; inverter short-circuit current capability over the first 20 cycles of a nearby fault.
  • Plant-level voltage and frequency control descriptions and settings, ride-through and relay settings, and communication and sampling delays between controllers.
  • Operating ambient temperature range and station service load.
  • BPA study reports and, where you obtain them from BPA, the power flow, short circuit and stability databases behind them.
  • Commissioning test recordings (time, POI voltage, collector substation voltage, POI MW and Mvar, shunt device Mvar) with the meta-data the Required Voltage and Frequency Control Performance Commissioning Tests standard lists.

Assumptions and considerations

How the scope is bounded.

  • This module applies to a new Interconnection Request studied under Attachment L; requests already in the Transition Cluster Study under Attachment R are outside this module.
  • BPA's pending TC-27 settlement and its TC-28 Markets+ tariff proceeding may revise the tariff. A later revision to Attachment L, the Large Generator Interconnection Business Practice or the Technical Requirements changes this scope.
  • We provide models in the formats BPA requires: GE PSLF (.epc) or PowerWorld (.aux) power flow, GE PSLF (.dyd) dynamics using models in the current WECC Approved Dynamic Model Library (REPC_B excluded), ASPEN OneLiner version 15 or later short circuit, and PSCAD version 5.0.2 or later EMT. We provide PSS/E or other formats only where BPA agrees to accept them.
  • Technical requirements follow the Technical Requirements for Interconnection to the BPA Transmission Grid Revision 13, the Interconnection Model Requirements Revision 00 and the Required Voltage and Frequency Control Performance Commissioning Tests Revision 01, as posted in October 2026.
  • We prepare; you submit all requests, models, attestations, forms and deposits to BPA and sign the Generation Model and Performance Attestation. Site Control, commercial readiness demonstrations and NEPA materials remain your responsibility, and BPA performs the cluster studies, the Interconnection Facilities Study and the NEPA review.
  • Your generator operator performs the commissioning tests and records the data; we provide procedures, review and analysis, and on-site support only where agreed.
  • We rely on you for timely and accurate information, including OEM and engineering, procurement and construction (EPC) data; we assume no responsibility or liability for the accuracy of information supplied by you or your suppliers.
  • We do not guarantee the accuracy or quality of any models supplied by the OEMs, and the manufacturer certification of EMT models comes from the OEM.
  • This scope includes one round of corrections with the OEMs and EPC contractors per model deliverable; further rounds are additional support, approved in writing.
  • We use engineering judgment and best practices, including the WECC and NERC modeling guidelines BPA cites, where BPA documents do not specify a method.