Transmission vegetation management on applicable generator tie-line rights-of-way, with inspections and records on the plant.
About this module
This module develops your compliance procedure for NERC FAC-003-5, Transmission Vegetation Management on applicable generator tie-line (gen-tie) rights-of-way, and applies it at each applicable plant. FAC-003-5 applies to overhead transmission lines operated at 200 kV or higher (and certain lower-voltage lines identified by the PC/TP) that extend more than one mile beyond the generating station switchyard or lack clear line of sight to the POI. This module covers applicability determination, development of a defense-in-depth Vegetation Management Program (VMP), annual inspections, and annual work plans. Many IBR plants are not applicable; the module scales accordingly.
Module: 016
Kind: Compliance studies
Governing body: NERC
Applies to: Before and after commercial operation
Typical time: About one week, all in
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.