Recordings from your plant's transmission-connected elements checked against the standard's disturbance monitoring data requirements, and every gap recorded with its cause and fix.
About this module
PRC-002-5 requires Transmission Owners and Generator Owners of identified Bulk Electric System (BES) Elements to have sequence of events recording (SER) data for circuit breaker position (R2); fault recording (FR) data with the required electrical quantities (R3), record length, a minimum recording rate of 16 samples per cycle, and trigger settings (R4); and, where notified by the Reliability Coordinator, dynamic Disturbance recording (DDR) data with the required quantities, recording, and sampling rates (R6 through R9). The data must be time synchronized to Coordinated Universal Time within plus or minus 2 milliseconds (R10) and be retrievable for 10 calendar days and provided within 30 calendar days of a request (R11). On discovering a failure of recording capability, the owner must restore it within 90 calendar days or submit a Corrective Action Plan to the Regional Entity (R12).
This module checks recordings from your plant's PRC-002-5 elements, such as the point-of-interconnection breaker and the main power transformer, against those data requirements and, when a check fails, records the gap, its cause, and the fix in an event review workflow and report. This module also develops your PRC-002-5 compliance procedure for data reviews.
Module: 078
Kind: Event analysis
Governing body: NERC
Applies to: Operating plants
Typical time: Days per event, not weeks
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.