Modules · Compliance studies · Module 003
Project management for executing disturbance monitoring recommendations: equipment options, installation coordination and configuration validation to meet NOGRR 255 and PRC-028-1.
About this module
We provide project management support to help you execute disturbance monitoring recommendations at each plant, including coordination of equipment options, equipment installation, and configuration and validation of disturbance monitoring equipment (DME) to meet ERCOT Nodal Operating Guide Revision Request (NOGRR) 255 and NERC PRC-028-1 obligations.
This work is intended to accelerate short-term readiness for the disturbance monitoring requirements (locations, measurements, recording, retention, and data delivery workflows), while establishing a repeatable, audit-ready process that can be scaled across your fleet.
NOGRR 255 revised ERCOT Nodal Operating Guide Section 6.1 for generation resources and energy storage resources, including equipment location, data, recording, retention, reporting, and maintenance/testing requirements. PRC-028-1 establishes similar disturbance monitoring obligations for applicable inverter-based resources (IBRs).
The project management support will be performed in accordance with the following reference documents and requirements:
1. ERCOT Nodal Operating Guide Section 6.1, Disturbance Monitoring Requirements (as revised by NOGRR 255)
2. NOGRR 255 implementation plan and associated ERCOT guidance for disturbance monitoring equipment (DME)
3. NOGRR 279 - Deadline Extensions for Recording Equipment Installations
4. NERC Reliability Standard PRC-028-1 (Disturbance Monitoring and Reporting Requirements for Inverter-Based Resources)
5. Plant-specific single-line diagrams, protection and metering one-lines, and as-built drawings (available revisions)
6. Plant-specific NOGRR 255 and PRC-028-1 compliance assessment reports
7. Original equipment manufacturer (OEM) and vendor manuals for digital fault recorders (DFRs), sequence of events recorders (SERs), phasor measurement units (PMUs), relays and intelligent electronic devices (IEDs), data concentrators, and time synchronization equipment
8. Plant networking/communications architecture and cybersecurity access requirements for data extraction and retention
Module: 003
Kind: Compliance studies
Governing body: ERCOT and NERC
Applies to: Operating plants
Typical time: Follows the installation schedule at each plant
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.