Protection System settings coordination and event, fault and disturbance recording for data-center sites under NERC's proposed CLO-003-1.
About this module
The new CLO-003-1 standard (Computational Load Protection Coordination & Disturbance Monitoring) applies to Computational Load Sites with a total connected Load of 50 MW or more supplied through electrical equipment connected at 100 kV or above, and requires disturbance monitoring data at each site and coordinated Protection System settings. The Computational Load Owner (CLO) must have sequence of event recording (SER) of circuit breaker position for breakers associated with equipment it owns, including buses and, as applicable, the main power transformers, on-site generation, and shunt static and dynamic reactive devices (R1). The owner of the main power transformer(s) supplying the site, whether the CLO, a Transmission Owner, a Distribution Provider, or a Generator Owner, must have triggered fault recording (FR) on the high side of the main power transformer(s) or common point of connection, capturing phase-to-neutral voltages, phase and residual or neutral currents, and three-phase real and reactive power, with at least a two-cycle pre-trigger, a 2.0-second total record, 64 samples per cycle, and triggers for neutral (residual) overcurrent, phase overvoltage and undervoltage, and overfrequency and underfrequency (R2, R3); and must have continuous dynamic disturbance recording (DDR) and storage of voltage, current, real and reactive power flows, and frequency at the same location, with an input sampling rate of at least 960 samples per second and an output recording rate of at least 60 times per second (R4, R5). The entity responsible for the data must synchronize it to UTC with device clock accuracy within +/-1 millisecond (R6), keep it retrievable for 20 calendar days, inclusive of the day recorded, and provide requested data to its Transmission Planner, Planning Coordinator, Transmission Operator, Balancing Authority, Reliability Coordinator, Regional Entity, or NERC within 15 calendar days of a request unless the requestor grants an extension, with SER data in ASCII CSV following Attachment 1, FR and DDR data in CSV or COMTRADE, and COMNAME file naming (R7), and, on discovering a recording failure, restore it within 90 calendar days or submit a Corrective Action Plan (CAP) to the Regional Entity within 90 calendar days and implement it (R8). The CLO must also establish and use a process for developing new and revised Protection System settings so that Protection Systems operate in the intended sequence during Faults, including provisions to coordinate with Transmission Owners, Generator Owners, and Distribution Providers whose equipment is electrically joined at the site (R9, R10).
CLO-003-1 is pending FERC approval; FERC has directed NERC to file computational load Reliability Standards by December 31, 2026. If FERC approves it, the standard becomes effective in the United States on the first day of the first calendar quarter after the effective date of FERC's approval order, or as FERC otherwise provides. The implementation plan sets compliance with R1-R8 at 36 months after the effective date for sites in service on or before the effective date, and at 15 months after the effective date or the in-service date, whichever is later, for sites in service after it; R9 and R10 apply 9 months after the effective date. An entity with a site in service no later than 12 months after the effective date may request an extension of the R1-R8 compliance dates from its Compliance Enforcement Authority if circumstances beyond its control, such as supply chain delays, inability to secure scheduled outages, or other exceptional circumstances, prevent installation of Disturbance Monitoring Equipment; the request is due no later than 3 months before the compliance date.
This module covers digitizing the assessment and compilation of compliance documentation to support compliance preparedness for NERC CLO-003-1.
Module: 087
Kind: Compliance studies
Governing body: NERC
Applies to: New and in-service sites
Typical time: Follows the standard's clocks