A rule-by-rule power factor envelope verdict from the submitted capability curve, in place of a hand check.
About this module
Automates the ERCOT Nodal Protocols Section 3.15(4) reactive-capability review for a Generation Resource or Energy Storage Resource (ESR) providing Voltage Support Service. From your submitted capability curve the workflow returns a deterministic power-factor-envelope verdict - the lagging and leading power factor envelope at maximum net power, rectangle coverage by resource type, the self-limiting anchor, and the low-MW structural rules - instead of hand-checking each criterion.
Module: 063
Kind: Modeling studies
Governing body: ERCOT
Applies to: Before and after commercial operation
Typical time: Two to three weeks, all in, including your review
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.