Modules · Modeling studies · Module 060
The ERCOT automatic voltage regulator step-response test, from site procedure to the submission package your Qualified Scheduling Entity files with ERCOT.
About this module
ERCOT Nodal Operating Guide (NOG) Section 2.2.5 requires Resource Entities to perform Automatic Voltage Regulator (AVR) tests at initial qualification and supports periodic AVR retesting on a 5-year cycle. NERC MOD-025-2 mandates verification of generator reactive capability with the AVR in service every 5 years (at most 66 months) for all Bulk Electric System (BES) resources above 20 MVA. For ERCOT inverter-based resources (IBRs), both obligations apply, and operators typically execute one coordinated test window producing two distinct submissions. This module covers the AVR step-response test deliverables: site-specific test procedure development, pre-test data intake, advisory coordination with the Resource Entity and its Qualified Scheduling Entity (QSE), post-test data analysis, ERCOT NDCRC AVR Template completion, and submission package delivery to the QSE for submission in ERCOT's Market Information System (MIS).
This module is scoped to ERCOT NOG Section 2.2.5 (the AVR step-response test). Reactive capability verification per NERC MOD-025-2 (sustained leading / lagging tests) is covered by the GridStrong MOD-025-2 module and is a companion offering when both submissions are required.
Module: 060
Kind: Modeling studies
Governing body: ERCOT
Applies to: Operating plants
Typical time: Two to three weeks, all in, including your review
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.