Modules · Modeling studies · Module 045

MISO Grid-Forming Model Quality Tests

Additional model quality and grid-forming conformity tests for grid-forming inverter-based resources.

About this module

What this module covers.

For grid-forming (GFM) inverter-based resources, MISO requires additional Model Quality Tests and Appendix H GFM conformity tests as part of the resource interconnection process. This module covers conducting the GFM modeling, MQT, and conformity assessments required to demonstrate GFM performance in accordance with MISO's requirements.

At a glance

Module: 045
Kind: Modeling studies
Governing body: MISO
Applies to: Before and after commercial operation
Typical time: Two to three weeks, all in, including your review

Dashboard capabilities

  • Model Workspace Management: your plant's simulation model files kept in one dashboard workspace, with version tracking
  • PSCAD Simulations
  • PSS/E Simulations

Support services

What GridStrong does inside this module.

  • Develop and tune GFM plant models in PSCAD and PSS/E.
  • Execute Appendix H GFM conformity tests per MISO's requirements.
  • Conduct the required Model Quality Tests for the GFM plant.
  • Compile and deliver the conformity assessment and MQT report.

Final deliverables

  • GFM MQT and Appendix H conformity assessment report.
  • Validated GFM plant models.

What we need from you

  • OEM-supplied inverter and PPC models.
  • Plant single-line diagram and control narratives.
  • GFM configuration details and control mode settings.

Assumptions and considerations

How the scope is bounded.

  • You supply all OEM-provided GFM models and documentation.

Run this module on one site.

Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.