PSS/E, PSCAD and short-circuit models, Planning Procedure 5-6 model acceptance tests and study support through ISO-NE's Cluster Study Process, through commercial operation.
About this module
This package covers modeling and support for one or more interconnection requests in the ISO New England (ISO-NE) region. ISO-NE studies new Generating Facilities, including storage, in Clusters under Schedule 22 (Large Generator Interconnection Procedures, more than 20 MW) and Schedule 23 (Small Generator Interconnection Procedures, 20 MW or less) of its Open Access Transmission Tariff, as revised for Federal Energy Regulatory Commission Order No. 2023. The Cluster Study Process runs through the Cluster Request Window, the Customer Engagement Window and its Scoping Meeting, the Cluster Study, any Cluster Restudies and the Interconnection Facilities Study, followed by the interconnection agreement, Initial Synchronization and Commercial Operation. Every request needs PSS/E power flow and dynamics models and an ASPEN OneLiner short-circuit model, and wind and inverter-based plants also need PSCAD models, model acceptance tests and PSS/E-PSCAD benchmarking that meet Planning Procedure 5-6 (PP5-6) and its appendices. This package covers the five stages below, from the Interconnection Request through post-Commercial Operation model updates.
Module: 092
Kind: Interconnection studies
Governing body: ISO-NE
Applies to: Before and after commercial operation
Typical time: Follows the ISO-NE interconnection calendar
Support services
Assumptions and considerations
Other modules
Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.