PRC-029-2 R4 Exemption Request Preparation

For plants with hardware limits on ride-through: the documented limitation, technical verification and submittal package for Requirement R4, including the eligibility record for long-lead projects.

About this module

What this module covers.

Requirement R4 of NERC PRC-029-2 applies to Generator Owners whose inverter-based resources (IBRs) have known hardware limitations that prevent them from meeting the ride-through criteria in R1 to R3, where the IBR is in service by October 1, 2026, or enters service later with an interconnection agreement executed by October 1, 2026 and a procurement contract for the limiting hardware executed before September 1, 2025. You must document the IBR's facility name and NCR number, which ride-through requirements it cannot meet and the hardware's capability, and technical documentation that the hardware would need to be physically replaced and that software updates or setting changes cannot remedy the limitation, and share it with planners, operators and the Compliance Enforcement Authority (CEA). For IBRs in service by October 1, 2026 whose owner was already responsible for compliance, the implementation plan sets the submission date at 12 months after the PRC-029-2 effective date. You must also respond to any information requests within 90 days and notify relevant entities within 90 days if the limiting hardware is replaced, at which point the exemption ends.

This module covers preparing the Requirement R4 exemption request documentation and supporting evidence for submittal to the CEA, and digitizing the compilation of evidence for Requirement R4.

At a glance

Module: 004
Kind: Compliance studies
Governing body: NERC
Applies to: Operating plants
Typical time: About one week, all in

Dashboard capabilities

  • Automated Compliance Workflow for PRC-029-2 R4 Exemption

Support services

What GridStrong does inside this module.

  • Identify all in-service IBR units with known hardware limitations affecting ride-through capability.
  • Gather OEM data and technical evidence confirming that limitations are hardware-based and not correctable through settings or firmware updates.
  • Define which ride-through criteria (voltage, frequency, or both) cannot be met and quantify the shortfall.
  • Compile identifying information for each affected unit (facility name and the Generator Owner's NCR number), and for long-lead projects the executed interconnection agreement and procurement contract that establish eligibility.
  • Develop draft documentation and evidence package for submission to the Planning Coordinator, Transmission Planner, Transmission Operator, Reliability Coordinator, and CEA.

Final deliverables

  • Compilation and preparation of PRC-029-2 R4 exemption documentation package including verified hardware limitation evidence, affected ride-through criteria summary, OEM technical justification, and draft transmittal materials for submission to applicable entities (PC, TP, TOP, RC, and CEA).

What we need from you

  • OEM technical documentation of the hardware limitation, showing why settings or firmware changes cannot remedy it.
  • Facility name and the Generator Owner's NCR number for each affected unit.
  • Executed interconnection agreement and hardware procurement contract for long-lead projects.
  • Ride-through protection settings and capability data for the affected units.

Assumptions and considerations

How the scope is bounded.

Run this module on one site.