We are hiringCome build the future of the grid with us.Find your role

Modules · Compliance studies · Module 061

ERCOT Emergency Operations Plan

The Public Utility Commission of Texas emergency operations plan filing, assembled from the plant record instead of written from scratch.

About this module

What this module covers.

Produces the ERCOT Emergency Operations Plan (EOP) filing required by Public Utility Commission of Texas (PUCT) rule 16 Texas Administrative Code (TAC) Section 25.53. The workflow assembles the EOP and the PUCT Executive Summary crosswalk and affidavit from your plant profile and its emergency-contact roster, so you file a complete, rule-mapped package rather than writing it from scratch.

At a glance

Module: 061
Kind: Compliance studies
Governing body: PUCT
Applies to: Operating plants
Typical time: About one week, all in

Dashboard capabilities

  • Automated Compliance Workflow for ERCOT EOP (16 TAC Section 25.53)
  • EOP Plan and PUCT Executive Summary crosswalk/affidavit generation
  • Emergency-contact roster sourced from your plant's roles

Support services

What GridStrong does inside this module.

  • Assemble the EOP from your plant profile and emergency-contact roster.
  • Map the plan to 16 TAC Section 25.53 and prepare the PUCT Executive Summary crosswalk and affidavit.
  • Deliver the complete, rule-mapped package for your filing.

Final deliverables

  • ERCOT Emergency Operations Plan document.
  • PUCT Executive Summary crosswalk and affidavit.

What we need from you

  • The plant profile, including the emergency-contact roster (plant roles).

Assumptions and considerations

How the scope is bounded.

Run this module on one site.

Tell us the plant and the deadline. An engineer confirms the inputs, the schedule and what the Dashboard needs from you.