Operational data specifications, Operating Instructions and Interpersonal Communication for data-center owners and operators under NERC's proposed CLO-002-1.
About this module
The new CLO-002-1 standard (Computational Load Operational Data and Communications) applies to Computational Load Sites with a total connected Load of 50 MW or more supplied through electrical equipment connected at 100 kV or above, and gives Transmission Operators, Balancing Authorities, and Reliability Coordinators the site data they need, and gives Transmission Operators and Balancing Authorities Interpersonal Communication capability with each site's Computational Load Operator. Each Transmission Operator, Balancing Authority, and Reliability Coordinator must maintain and distribute a documented data and information specification for Computational Load Sites (R1-R6), and each Computational Load Owner (CLO) and Computational Load Operator (CLOP) that receives one must satisfy it (R7), including its deadlines or periodicity, availability and accuracy criteria, model submissions consistent with the model submitted for planning purposes, subject to modifications for operations purposes, as applicable, update and correction provisions, format, and secure transfer method. The CLOP must comply with each Operating Instruction issued by its Transmission Operator, Balancing Authority, or Reliability Coordinator unless the action cannot be physically implemented or would violate safety, equipment, regulatory, or statutory requirements (R8), and must inform the issuer when it cannot comply (R9); the proposed modified Glossary definition of Operating Instruction would cover commands to a Computational Load Site. The CLOP must have Interpersonal Communication capability with its Balancing Authority and Transmission Operator (R11) and, on detecting a failure of that capability, consult each affected entity to determine a mutually agreeable restoration action (R13). The CLOP must train each operator who can receive an oral two-party, person-to-person Operating Instruction in three-part communication (repeat the instruction and receive confirmation, or request that it be reissued) before that operator receives one (R14), and must use that protocol for each such instruction received during an Emergency (R15).
CLO-002-1 is pending FERC approval; FERC has directed NERC to file computational load Reliability Standards by December 31, 2026. If FERC approves it, the standard becomes effective in the United States on the first day of the first calendar quarter after the effective date of FERC's approval order, or as FERC otherwise provides. The implementation plan phases compliance: the Transmission Operator, Balancing Authority, and Reliability Coordinator specification requirements (R1-R6) at 6 months, and R7-R15, which include every CLO and CLOP requirement plus the Transmission Operator and Balancing Authority communication requirements (R10, R12), at 12 months after the effective date. The Computational Load Site and Computational Load Owner definitions must be approved before CLO-002-1 becomes effective. An entity with a Computational Load Site in service no later than 12 months after the effective date may request an extension of the R8-R15 compliance dates from its Compliance Enforcement Authority if circumstances beyond its control, such as supply chain delays in the procurement, engineering, installation, or commissioning of Interpersonal Communication equipment, prevent it from establishing Interpersonal Communication capability and associated protocols; the request is due no later than 3 months before the compliance date.
This module covers digitizing the preparation of compliance procedures, operating procedures, training materials, and evidence records to support compliance preparedness for NERC CLO-002-1.
Module: 086
Kind: Compliance studies
Governing body: NERC
Applies to: In-service sites
Typical time: Follows the standard's clocks