Insight
PRC-029-2 makes IBR ride-through performance-based, so design, models and event data need to be managed together.
FERC approved PRC-029-1 in July 2025, and its successor, PRC-029-2, took effect October 1, 2026. PRC-029-2 keeps the R1 to R3 ride-through requirements and their compliance dates, apart from new Attachment 1 relief for certain HVDC-connected IBRs, and rewrites the R4 hardware-limitation exemption. It sets ride-through performance requirements for inverter-based resources (IBRs) and expects evidence that plants perform in the field, not only that settings are right on paper. That evidence depends on disturbance data and on models that match the plant, so protection settings, dynamic models and event records need to be managed together.
PRC-029-2 introduces performance-based ride-through obligations for IBRs, and its implementation plan ties the operational requirements to PRC-028-1 disturbance monitoring, while PRC-030-1 covers analysis of unexpected events. That means your evidence chain must connect:
Key details to internalize:
Applicability covers BES IBRs and Category 2 IBRs, which are non-BES IBRs that have or contribute to 20 MVA or more delivered to a common point of connection at 60 kV or above. Plan for both populations.
GridStrong centralizes "as-left" settings and automates PRC-029-2 compliance checks across inverter controls, feeder relays, and the plant controller. The PRC-029-2 module packages the required procedure, design evaluation, settings analysis, and ongoing evidence capture, so reviews are kept in one place.
Why this matters: PRC-029-2 is about performance zones, not just setpoint lists. Automated checks catch transcription mistakes and protection logic that would trip inside the must Ride-through zone.
Compliance hinges on models that reflect reality. GridStrong aligns plant models to field settings, runs required ride-through cases, and overlays simulated vs. measured responses in tools like PSS®E, PSCAD, and TSAT - closing the loop between design and study.
Practical advantages:
For ERCOT sites, GridStrong's MQT workflow plans, executes, benchmarks, and reports all required legacy and preferred cases - with side-by-side overlays and pre-/post-mod comparisons.
PRC-029-2 expects the plant to ride through events that PRC-028-1 equipment records, and PRC-030-1 requires the owner to analyze qualifying output losses and then either correct the cause or justify why not. GridStrong ingests SCADA, DFR, SER, and PMU data; auto-identifies ride-through failures; and generates the required evidence packages and corrective action tracking.
Design parameters, model parameters and event performance are kept in one system so they can be compared directly.
Implication: BES design evaluations are due now, Category 2 design compliance starts January 1, 2027, and operational proof depends on PRC-028-1 recording, which phases in through January 1, 2030.
GridStrong covers PRC-028-1, PRC-029-2 and PRC-030-1 compliance, modeling and event analysis in one platform.
PRC-029-2 touches protection engineering, dynamic modeling and operational event analysis, so its evidence has to be consistent across all three. GridStrong keeps settings, models and event records together so that evidence comes from one place.
Bring the question to a GridStrong engineer. We will walk through how it applies to your plants, your models and your deadlines.