decor

Power Wind Projects With Faster, Interconnection and Built In Compliance

GridStrong helps utility-scale wind developers and operators manage the AC side of the plant like never before.

decor

Industry Challenges

Evolving Grid Standards

Keeping up with shifting ISO and NERC interconnection requirements adds constant overhead and uncertainty.

Turbine Model Uncertainty

Edge-case conditions and complex turbine behavior make it difficult to validate models with confidence.

Limited Grid Visibility

Operators often lack context around grid disturbances and their true impact on wind asset performance.

NERC O&P Standards

By subscribing to a Module for any NERC O&P Standard, you access the best proprietary consulting workflow to document execution of a compliance procedure for that standard and can watch us in real-time as we complete our review on your behalf.

Protection Standards

PRC-002-2
PRC-025-2
PRC-012-2
PRC-027-1
PRC-017-1
PRC-024-3
PRC-019-2
A diagram of a fac and a mod.

Enhanced IBR Standards

PRC-028-1
PRC-029-1
PRC-030-1

Modeling Standards

MOD-025-2
MOD-026-1
MOD-027-1
MOD-026-2
MOD-027-2
MOD-032-1

And Much More...

FAC-002
FAC-003
FAC-008
FAC-014
VAR-001-5
VAR-002-4.1
TOP-003-6.1
IRO-010-5
decor
decor

Who It's For

Power System Modelers

Learn More

NERC & ISO Compliance Officers

Learn More

Asset Managers

Learn More

Plant Engineers

Learn More

BUILT BY A FRUSTRATED CONSULTANT TO END FRUSTRATION FOR OWNERS & OPERATORS

Get a Demo
A black and white photo of an airplane in the sky.