decor

PRC-029-01 For OwNERS & oPERATORS

GridStrong combines modeling, data extraction, and compliance automation to help inverter-based resources meet PRC-029-1 requirements ahead of deadlines.

A 3d image of a solar system on a black background.

Gridstrong's Approach to PRC-029-01

Combine Analysis & modeling

A rigorous approach must combine thorough analysis of as-left settings with modeling. We evaluate inverter and turbine settings, extract data from RDB files and build the curve to identify potential non-compliance. We deploy a suite of 12 tests to independently model and verify each of the Requirements and Parts of PRC-029-1.

Don't let OEMs slow you down

Start now with the information available and determine if any exemption is required even if waiting for an OEM who may have future software updates. We work through future updates at a later stage. Running up against the deadline is not an option for those who manage dozens or hundreds of assets.

Coordinate work efficiently

Evaluate early if a TOV study will be required, or whether you need to address insulation coordination, or if a PRC-019 study is now triggered. Failure to think holistically will result in unnecessary costs and time duplicating work down the road.

Don't Get Caught Unprepared

With implementation deadlines approaching fast, Generator Owners need to act now. PRC-029-1 requires comprehensive ride-through documentation for all inverter-based resources—from solar PV to wind to hybrid plants.

A computer chip with red and blue lights on it.
decor

our most popular modules

prc-028-1

Disturbance Monitoring & Reporting Requirements for Inverter-Based Resources

PRC-029-1

Frequency & Voltage Ride-Through Requirements for Inverter-Based Resources

prc-030-1

Unexpected Inverter-Based Resource Event Mitigation

MOD-026-1

Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions

mod-027-1

Verification of Models and Data for Turbine/Governor and Load Control or Active Power/ Frequency Control Functions

+ more...

We're adding new modules every day. Have an idea for one? Reach out!

PRC-029-01 FAQs

What does PRC-029-01 require?
Which plants need to comply with PRC-029-01?
What does complying with PRC-029-1 entail?
What if my plant can't meet the requirements?
How is this different from hiring consultants?
Can you work with our existing compliance program?