
GridStrong combines modeling, data extraction, and compliance automation to help inverter-based resources meet PRC-029-1 requirements ahead of deadlines.

A rigorous approach must combine thorough analysis of as-left settings with modeling. We evaluate inverter and turbine settings, extract data from RDB files and build the curve to identify potential non-compliance. We deploy a suite of 12 tests to independently model and verify each of the Requirements and Parts of PRC-029-1.
Start now with the information available and determine if any exemption is required even if waiting for an OEM who may have future software updates. We work through future updates at a later stage. Running up against the deadline is not an option for those who manage dozens or hundreds of assets.
Evaluate early if a TOV study will be required, or whether you need to address insulation coordination, or if a PRC-019 study is now triggered. Failure to think holistically will result in unnecessary costs and time duplicating work down the road.
With implementation deadlines approaching fast, Generator Owners need to act now. PRC-029-1 requires comprehensive ride-through documentation for all inverter-based resources—from solar PV to wind to hybrid plants.

Disturbance Monitoring & Reporting Requirements for Inverter-Based Resources
Frequency & Voltage Ride-Through Requirements for Inverter-Based Resources
Unexpected Inverter-Based Resource Event Mitigation
Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions
Verification of Models and Data for Turbine/Governor and Load Control or Active Power/ Frequency Control Functions
We're adding new modules every day. Have an idea for one? Reach out!