Generator Relay Loadability
PRC-025-2 requires Generator Owners, Transmission Owners and Distribution Providers that apply load-responsive protective relays at the terminals of listed Elements of BES generating units and plants to set each relay to the criteria in Attachment 1, while maintaining reliable fault protection. The purpose is to keep generators from tripping unnecessarily during a system disturbance for conditions that do not pose a risk of damage to the equipment.
Source
NERC PRC-025-2 (standard page)October 29, 2026
Requirements
What it means. Apply settings that are in accordance with Attachment 1 on each load-responsive protective relay while maintaining reliable fault protection. Table 1 of Attachment 1 gives one or more options for each application (generating unit, GSU transformer, unit auxiliary transformer, export Elements) and relay type (for example 21, 50, 51, 51V and 67), each with a bus voltage and setting criteria. Synchronous generator criteria derive from the unit's maximum gross Real Power capability reported to the Transmission Planner and its nameplate MVA at rated power factor. Asynchronous generator criteria, including inverter-based installations, derive from the site's aggregate maximum complex power capability in MVA as reported to the Transmission Planner, including the Mvar output of any static or dynamic reactive power devices. If different seasonal capabilities are reported, the maximum capability is used as a minimum requirement, and the Generator Owner may base settings on a higher capability than it reported.
Evidence an auditor expects. For each load-responsive protective relay, evidence that the settings were applied per Attachment 1, such as summaries of calculations, spreadsheets, simulation reports or setting sheets.
Inverter-based plants, including Type 3 and Type 4 wind and photovoltaic solar, use the asynchronous generator options of Attachment 1 Table 1 (Options 4, 5, 6, 10, 11, 12, 17, 18 and 19), as do Type 1 and Type 2 induction wind turbine installations.